Browse
Search
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:07:41 PM
Creation date
2/25/2013 12:10:54 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7c
Document Relationships
Agenda - 11-08-2012 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 11-08-2012 - Regular Mtg.
R 2013-069 Planning - J F Wilkerson Contracting -Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
able to sureties as a defense in the jurisdiction of the suit tractor of any amounts received or to be received by <br /> shall be applicable. the Owner in settlement of insurance or other claims <br /> for damages to which the Contractor is entitled,re- <br /> 10 Notice to the Surety,the Owner or the Contractor shall duced by all valid and proper payments made to or on <br /> be mailed or delivered to the address shown on the sig- behalf of the Contractor under the Construction Con- <br /> nature page. tract. <br /> 11 When this Bond has been furnished to comply with a 12.2 Construction Contract:The agreement between <br /> statutory or other legal requirement in the location where the Owner and the Contractor identified on the sig- <br /> the construction was to be performed,any provision in this nature page, including all Contract Documents and <br /> Bond conflicting with said statutory or legal requirement changes thereto. <br /> shall be deemed deleted herefrom and provisions con- <br /> forming to such statutory or other legal requirement shall 12.3 Contractor Default: Failure of the Contractor, <br /> be deemed incorporated herein. The intent is that this which has neither been remedied nor waived,to per- <br /> Bond shall be construed as a statutory bond and not as a form or otherwise to comply with the terms of the <br /> common law bond. Construction Contract. <br /> 12 DEFINITIONS 12.4 Owner Default: Failure of the Owner,which has <br /> neither been remedied nor waived,to pay the Con- <br /> 12.1 Balance of the Contract Price:The total amount tractor as required by the Construction Contract or to <br /> payable by the Owner to the Contractor under the perform and complete or comply with the other terms <br /> Construction Contract after all proper adjustments thereof. <br /> have been made, including allowance to the Con- <br /> MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> (Space is provided below for additional signatures of added parties,other than those appearing on the cover page.) <br /> CONTRACTOR AS PRINCIPAL SURETY <br /> Company: (Corporate Seal) Company: (Corporate Seal) <br /> Signature: Signature: <br /> Name and Title: Name and Title: <br /> Address: Address: <br /> AIA DOCUMENT A312-PERFORMANCE BOND AND PAYMENT BOND-DECEMBER 1984 ED.-AIA® A312-1984 3 <br /> F.9748B(3111) <br />
The URL can be used to link to this page
Your browser does not support the video tag.