Browse
Search
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2013
>
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 4:07:41 PM
Creation date
2/25/2013 12:10:54 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
7c
Document Relationships
Agenda - 11-08-2012 - 7c
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 11-08-2012 - Regular Mtg.
R 2013-069 Planning - J F Wilkerson Contracting -Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJCDC <br /> SUGGESTED FORM OF AGREEMENT 7C <br /> BETWEEN OWNER AND CONTRACTOR FOR <br /> CONSTRUCTION CONTRACT(STIPULATED PRICE) <br /> THIS AGREEMENT is by and between Orange County <br /> (Owner)and <br /> (Contractor). <br /> Owner and Contractor,in consideration of the mutual covenants set forth herein,agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br /> described as follows: <br /> Orange County Buckhorn-Mebane EDD Phase 2 Water and Sewer Improvements <br /> ARTICLE 2-THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described <br /> as follows: <br /> The Work is generally described as follows: The proposed sewer improvements include the <br /> installation of approximately 923 If of 8-inch, 5,093 If of 12-inch, and 8,976 If of 18-inch gravity sewer <br /> and 73 manholes. <br /> Proposed water improvements include the installation of approximately 14,020 If of 16-inch water <br /> main. <br /> ARTICLE 3-ENGINEER <br /> 3.01 The Project has been designed by Hobbs,Upchurch&Associates,P.A.-300 S.W.Broad Street,Southern Pines, <br /> North Carolina 28387(Engineer),who is to act as Owner's representative,assume all duties and responsibilities,and <br /> have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the <br /> Work in accordance with the Contract Documents. <br /> ARTICLE 4-CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones,if any,Substantial Completion,and completion and readiness for final payment as stated <br /> in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion and Final Payment <br /> A. The Work will be substantially completed within 365 consecutive calendar days after the date when the Contract <br /> Times commence to run as provided in Paragraph 2,03 of the General Conditions, and completed and ready for final <br /> payment in accordance with Paragraph 14.07 of the General Conditions within 395 consecutive calendar days after the <br /> date when the Contract Times commence to run. <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00520-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.