Orange County NC Website
5. The applicant shall be required to obtain final approval for the proposed dumpster <br /> pad location from Orange County Solid Waste prior to the commencement of earth <br /> disturbing activity. <br /> 6. The applicant shall be required to obtain stormwater and erosion control permits <br /> from Orange County Erosion Control prior to the commencement of earth disturbing <br /> activity. <br /> 7. The applicant shall be required to obtain a driveway permit from the North Carolina <br /> Department of Transportation prior to the commencement of earth disturbing <br /> activity. <br /> The applicant shall provide the Orange County Planning Department with a copy of <br /> this permit. <br /> 8. The applicant shall be required to obtain building permits from the Orange County <br /> Inspections Department prior to the commencement of construction activity. <br /> 9. The applicant shall be required to obtain sign permits from the Planning Department <br /> in accordance with the provisions of the Orange County Unified Development <br /> Ordinance. <br /> 10. The applicant shall be required to maintain all required land use buffers in <br /> perpetuity in accordance with the requirements of Section 6.8 of the Orange County <br /> Unified Development Ordinance. <br /> 11. No ancillary commercial or residential use of individual storage facilities shall be <br /> permitted. This includes the use of storage facilities for automotive repair or retail <br /> sales. <br /> The applicant shall include this prohibition within storage unit lease documents <br /> informing clients of the prohibition. <br /> 12. No hazardous materials shall be stored on the property. <br /> The applicant shall include this prohibition within storage unit lease documents <br /> informing clients of the prohibition. <br /> 13.All required landscaping, as denoted on the site plan, shall be installed prior to the <br /> issuance of a Certificate of Occupancy allowing for the units to be rented/occupied. <br /> 14. The applicant shall contract with a private solid waste contractor to remove trash <br /> from the site consistent with the submitted site plan and in accordance with the <br /> Orange County Solid Waste Management Ordinance. <br /> Commissioner Yuhasz asked about condition 2 and said that it is not tied to any <br /> specific development activity. <br /> Michael Harvey suggested that when making the motion to revise condition 2 that staff <br /> record the final agreement within 90 days from approval. <br /> John Roberts asked Mr. Chandler if he was ok with the condition and he said yes. <br /> Commissioner Jacobs made reference to condition #13 and landscaping. He said that <br /> the accepted build out for Phase I did not have landscaping. <br /> Michael Harvey said that if the site plan is approved then the landscaping has to be <br /> installed as construction commences consistent with this approval. <br />