Orange County NC Website
Task 2. Ascertain Level of Service for Each School District. <br /> Once the County and school districts agree on the various choices, we will begin Task 2. One <br /> important subtask is calculating the appropriate level of service. Impact fees usually reflect the <br /> existing levels of service for purposes of calculating the new demand, unless there are <br /> extenuating circumstances. We will determine the appropriate current level of service through <br /> additional onsite interviews with the service providers and analysis of local data. As noted in the <br /> RFP, "existing school construction standards will be analyzed as well as the construction <br /> standards for new schools. This information will be used to project school capital improvement <br /> costs to 2005 and 2010. <br /> The above will enable us to ensure that two important impact fee legal requirements are met; <br /> namely the proportional benefit and the rational nexus relationships. The information from this <br /> task will be prepared in a written format which will then be submitted to the County and school <br /> districts for its review. <br /> As part of this task, we also will review cost estimates prepared by each school district for all <br /> completed and planned infrastructure improvements. <br /> Work Product: See Below <br /> Task 3. Review Capital Needs and Costs and Allocate to Growth. <br /> This task will determine relevant capital needs and associated capital facility costs due to the <br /> proposed development. <br /> A. Long Range Capital Needs. In this subtask, TA will further review the various studies and <br /> other data germane to the relevant school categories. TA will work with staff to forecast the <br /> capital facility needs due to development to 2005 and 2010. The discussions may include not <br /> only an understanding of the specific costs to provide the schools, but also include discussions <br /> pertaining to whether these capital facilities needs were due to normal replacement, catch-up, or <br /> new demand. <br /> B. Review Cost Estimates. In this subtask we will review, as relevant, the various capital <br /> costs for facilities. As part of this subtask, we will ascertain whether the facilities are likely to be <br /> bonded, and if so, the amortization schedule. <br /> As part of calculating the impact fees, the County may include the construction contract price; <br /> the cost of acquiring land, improvements, materials and fixtures; the cost for planning, <br /> surveying, and engineering fees for services provided for and directly related to the construction <br /> system improvement; and debt service charges, if impact fees are used to pay the debt service to <br /> finance the cost of the system improvements. <br /> As requested in the RFP, <br /> "the work product will reflect the appropriate Orange County construction and space <br /> standards for public elementary, middle and high school building areas and costs and the <br /> projection of school capital improvement costs to 2005 to 2010." <br /> 5 <br />