Browse
Search
Agenda - 02-25-2013 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 02-25-2013 - Quarterly Public Hearing
>
Agenda - 02-25-2013 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2015 11:21:20 AM
Creation date
2/15/2013 3:10:08 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2013
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
Document Relationships
Minutes 02-25-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 7: Subdivisions 16 <br />Section 7.5: Subdivision Agreements <br />(2) The estimated cost of the required improvements must be itemized and ce ified <br />by the applicant's licensed professional engineer or licensed professiona <br />surveyor, if the surveyor was the original preparer of the plans for the <br />subdivision. <br />(3) In the case of minor subdivisions, the subdivider's licensed profes i nal engineer <br />or licensed professional surveyor may provide the itemized cost timate. <br />(4) Cost estimates must be based on industry norms within Oran County. <br />5) The Planning Director or Planning Board may require a hig er guarantee amount <br />when deemed necessary to address higher potential corr tion costs due to the <br />subdivision's size and site characteristics, but in no eve t may the amount <br />exceed 25% of estimated construction costs. <br />(E) The gua ntee shall have a term of two years and shall pro ide an option for annual <br />renewal if a subdivider /developer has: <br />(1) Arran ed for County inspection of the improve ents, <br />(2) Submitt to the County an acceptable esti ate of the costs necessary to correct <br />any deteri ation or defects discovered b he inspection, and <br />(3) Increased th mount of the security b the amount of said estimate. <br />(F) The subdivider/develop e shall pay a fee in cordance with the Fee Schedule adopted <br />by the Board of County C missioners at e time of the initial posting of the guarantee <br />and for each subsequent re wal or ext sion to cover the County's administrative costs. <br />(A) The subdivider of all minor and m subdivisions shall record a subdivision agreement <br />outlining the limitations associat wi the development of created lots at the Orange <br />County Register of Deeds at t same a the Final Plat is recorded. <br />(B) The purpose of the subdivis n agreement to provide detail on various development <br />limitations that will regula the overall deve ment of property consistent with the <br />approval of the subdivis' n. <br />(C) This subdivision agre ment shall, at a minimum, tline the following development <br />criteria for property ithin the subdivision: <br />/The e development setbacks for lots within he project. <br />sous surface limits for the lots within the d elopment. <br />esence of identified environmental features (i. .stream buffers, flood plain, <br />ds, etc) and an explanation on how developme of the lot(s) is impacted. <br />esence of identified cultural features listed by the rth Carolina Heritage <br />m, or identified in "An Inventory of Sites of Cultural, istoric, Recreational, <br />cal, and Geological Significance in the Unincorporate ortions of Orange <br />" or "Inventory of the Natural Areas and Wildlife Habitat of Orange <br />ouny, North Carolina ". <br />(5) Identification of soil and septic limitations, if any, for each lot. <br />(6) Access restrictions for the project and individual lots. <br />(7) Limitations on land uses. <br />(8) Maintenance requirements for all roadways as well as references to the proj is <br />road maintenance agreement, if required. <br />The avoidance of congestion and overcrowding and the creation of conditions essential to public health, <br />safety and the general welfare may be best accomplished through the application of design standards <br />Orange County, North Carolina — Unified Development Ordinance Page 7 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.