Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS AND <br />PLANNING BOARD <br />QUARTERLY PUBLIC HEARING <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: February 25, 2013 <br />Action Agenda <br />Item No. C.1 <br />SUBJECT: Unified Development Ordinance Text Amendments — Modification of Site Plan <br />Submittal Requirements <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (Y /N) I Yes <br />ATTACHMENT(S): INFORMATION CONTACT: <br />1. Comprehensive Plan and Unified <br />Development Ordinance Amendment <br />Outline Form (UDO /Zoning 2012 -016) <br />2. UDO Amendment Package <br />3. Memo from the Commission for the <br />Environment (CFE) <br />3 <br />Michael D. Harvey, Planner III (919) 245 -2597 <br />Reynolds Ivins, Erosion Control (919) 245 -2586 <br />Craig Benedict, Director (919) 245 -2575 <br />PURPOSE: To hold a public hearing on Planning Director initiated text amendments to the <br />Unified Development Ordinance (UDO) in regards to the submission of formal site plans for <br />projects requiring stormwater plan approval. <br />BACKGROUND: On April 17, 2012 the BOCC approved a UDO amendment package <br />incorporating recent stormwater management and nutrient reduction strategies implemented by <br />the State. This included the establishment of land disturbance thresholds for both residential <br />and non - residential projects requiring submittal of formal, engineered, stormwater plans. Please <br />refer to Section B.1 of Attachment 1 for additional information on these thresholds. <br />This amendment seeks to clarify existing language within the UDO denoting when a formal site plan <br />is required and adds language requiring formal site plan submittal in those instances where <br />proposed land disturbance exceeds established stormwater management thresholds. Staff is also <br />proposing to include language requiring the development of formal stormwater plans, consistent with <br />established land disturbance thresholds, for minor and major subdivisions. Please refer to Section <br />B.2 of Attachment 1 for additional information. <br />Attachment 2 contains the proposed amendments with additions shown in iiii d text and <br />proposed deletions are shown in iiii iiii iiii as well as footnotes documenting the <br />rationale for the proposed modification. Attachment 3 contains a memorandum from the CFE, <br />which reviewed the proposal at its January 14, 2013 regular meeting. <br />Ordinance Review Committee (ORC) Review: The Planning Board ORC reviewed the proposed <br />amendments at its January 9, 2013 regular meeting. The proposed text in Attachment 2 includes <br />modifications made based on comments received at the ORC. Please refer to Section C.2 (a) of <br />Attachment 1 for a summary of the Board member's comments. <br />