Orange County NC Website
E:] <br />Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 6 <br />Deliverables <br />The deliverable for this project will be a single report with chapters describing findings for each <br />interconnection project. The report will be provided in electronic format. <br />Project Team <br />The Hazen and Sawyer team for this project will include: <br />Project Director: Michael Wang, PhD, P.E. <br />Project Manager: Jeffrey R. Cruickshank, P.E. <br />Modelers: <br />Crystal Broadbent, P.E <br />Todd Davis, P.E. <br />Ricardo Espinosa, P.E. <br />Megan Roberts, P.E. <br />Wayne Zhang, PhD, P.E., <br />Field Coordinator: <br />Kevin Widderich, E.I. <br />Compensation: <br />Compensation for services rendered shall be based on a Direct Labor Multiplier of 3.15 applied to <br />labor costs of the cumulative hours charged to the project by each employee providing services. <br />Table 1 depicts current direct salary rates for various staff positions expected to be involved with <br />this project. Actual rates will be based upon labor costs for the individuals working on the project at <br />the time services are rendered, and may differ from those shown in the table. <br />Table 1 — Direct Salary Rates <br />Position <br />Direct Salary Rates <br />Vice President <br />$75 <br />Senior Associate <br />$67 <br />Associate <br />$48 <br />Principal Engineer <br />$44 <br />Engineer/Field Coordinator <br />$40 <br />The Direct Labor Multiplier will be applied to actual labor costs and will include all overhead, profit, <br />travel, modeling software and computer costs, word processing, secretarial, telephones, faxes, etc. <br />It shall be understood the aggregate cost ceiling established for this project shall not be exceeded. <br />If a project takes fewer hours than estimated, the fee will be less than that shown. If the costs for <br />another project overrun that project's cost ceiling, remaining fees from other projects may be used. <br />1031-456 Potable Water Interconnection Study HAZENAND SA�WIi,R, <br />t,nv irrturorirrei`tm k!:ngineerr & Semnu usts <br />