Browse
Search
Agenda - 02-19-2013 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 02-19-2013 - Regular Mtg.
>
Agenda - 02-19-2013 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 9:52:37 AM
Creation date
2/15/2013 11:57:58 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 02-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 5 <br />Part Project Task Description Hours Fee <br />2.4 Analyze flow from Raleigh through Cary to Holly Springs and Apex ( #46, 50, 4, 5) 232 $ 34,160 <br />1 Gather information and interview Partners'staff <br />2 Update model at Cary's proposed connections to Holly Springs transmission main <br />3 Determine flow from Raleigh through Cary to Holly Springs <br />4 Determine flow from Raleigh through Cary to Apex <br />5 Identify improvements to increase above flows <br />6 Present preliminary results <br />7 Prepare report chapter that incorporates review comments <br />8 QC <br />2. 5 Analyze flow from Durham to Apex (1, 2, 3, 4, 6, 7, 9) 196 $ 30,600 <br />1 Gather information and interview Partners'staff <br />2 Determine flow from Durham through Cary to Apex <br />3 Identify improvements to increase above flows <br />4 Present preliminary results <br />5 Prepare report chapter that incorporates review comments <br />6 QC <br />2. 6 Analyze Cary- Durham - Raleigh interconnections in 2060 ( #9, 6, 7, 47, 43, 32, 42, 44, 45, 46, 25, 26, 27) 496 $ 72,720 <br />1 Gather information and interview Partners'staff <br />2 Adjust core models to 2060 demand from Triangle Regional Water Supply Plan <br />3 Identify improvements for 10 mgd from Durham to Cary /Apex <br />4 Identify improvements for 10 mgd from Raleigh to Cary /Apex <br />5 Identify improvements for 10 mgd from Durham and Raleigh to Cary /Apex <br />6 Identify improvements for 17 mgd from Durham to Cary /Apex <br />7 Identify improvements for 17 mgd from Raleigh to Cary /Apex <br />8 Identify improvements for 17 mgd from Durham and Raleigh to Cary /Apex <br />9 Determine flow from Harnett County through Holly Springs to Cary /Apex <br />10 Determine flow from Harnett County through Holly Springs and Cary /Apex to Raleigh <br />11 Determine flow from Harnett County through Holly Springs and Cary /Apex to Durham <br />12 Determine flow from Harnett County through Holly Springs, Cary /Apex and Durham to OWASA <br />13 Present preliminary results <br />14 Prepare report chapter that incorporates review comments <br />15 QC <br />Part 2 Totals 1,804 $ 266,040 <br />GRAND TOTALS 3,252 $ 481,320 <br />1031-456 Potable Water Interconnection Study HAZENAND SA�WIi,R, <br />t,nv irrturorirrei`tm k!:ngineerr & Semnu usts <br />
The URL can be used to link to this page
Your browser does not support the video tag.