Browse
Search
Agenda - 02-19-2013 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 02-19-2013 - Regular Mtg.
>
Agenda - 02-19-2013 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2015 9:52:37 AM
Creation date
2/15/2013 11:57:58 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes 02-19-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jordan Lake Partnership <br />Phase 2 Hydraulic Modeling Proposal <br />October 26, 2012 <br />Page 4 <br />Part Project Task Description <br />2 Add Raleigh, Apex, Holly Springs and North Chatham to model from Part 1 <br />2. 1 Analyze Cary emergency interconnections ( #9, 6, 7, 47, 43, 32, 42, 44, 44, 45, 46, 50, 4, 31 2, & 1) <br />1 Gather information and interview Partners'staff <br />2 Update Apex model infrastructure <br />3 Add Raleigh and Apex to model from Part 1 and add details at interconnections <br />4 Check model calibration at interconnections <br />5 Analyze Cary emergency interconnections with 42" pipe out of service <br />6 Analyze Cary emergency interconnections with CAWTF out of service <br />7 Present preliminary results <br />8 Prepare report chapter that incorporates review comments <br />9 QC <br />2. 2 Analyze Apex -Holly Springs interconnection ( #21, 5, 1, 2, 3, 4) <br />1 Gather information and interview Partners'staff <br />2 Add new Holly Springs model to core model and add details at interconnections <br />3 Identify more efficient locations for current pump station <br />4 Identify improvements for 2 mgd to Holly Springs + 3 mgd to Apex + 7 mgd to Cary from Harnett <br />5 Determine sustainable flow from Apex to Holly Springs <br />6 Present preliminary results <br />7 Prepare report chapter that incorporates review comments <br />8 QC <br />2. 3 Analyze flow between Cary and Chatham County (#48,1,2,3,4) <br />1 Gather information and interview Partners'staff <br />2 Add North Chatham County model to core model and add details for connecting pipes <br />3 Determine flow from Cary through Apex to Chatham County <br />4 Determine flow from Chatham County through Apex to Cary <br />5 Present preliminary results <br />6 Prepare report chapter that incorporates review comments <br />7 QC <br />Eel <br />Hours Fee <br />400 $ 58,000 <br />240 $ 35,280 <br />240 $ 35,280 <br />1031-456 Potable Water Interconnection Study HAZENAND SA�WIi,R, <br />t,nv irrturorirrei`tm k!:ngineerr & Semnu usts <br />
The URL can be used to link to this page
Your browser does not support the video tag.