Orange County NC Website
DRAFT Attachment 5 16 <br />ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br />Craig N. Benedict, AICP, Director <br />Administration 131 W. Margaret Lane <br />(919) 245 -2575 P O Box 8181 <br />(919) 644 -3002 (FAX) ,- Hillsborough, NC 27278 <br />www.orangecountync.gov <br />February 22, 2013 <br />Marc L. Hamel, Rail Environmental Manager <br />NC DOT Rail Division <br />Environmental and Planning Branch <br />1553 Mail Service Center <br />Raleigh, NC 27699 -1553 <br />Subject: Additional scoping comments related to the proposed private crossing <br />closures with the North Carolina Railroad (NCRR) /Norfolk Southern (NS) <br />Railway at Gordon Thomas Drive (TIP No. P- 44051), Greenbriar Drive <br />(TIP No. P- 4405J), and Byrdsville Road (TIP No. P- 4405K) in Orange <br />County <br />Dear Mr. Hamel: <br />Thank you for your reply letter of December 20, 2012 on Orange County's scoping <br />comments on NCDOT Rail Division's three proposed private crossing closures with the <br />NCRR /NS Railway referenced above. After reviewing your reply letter, reviewing the <br />revised project study area maps, and considering the public comments provided in <br />response to the associated Citizen Informational Workshops, we offer the following <br />additional comments. <br />IN GENERAL: <br />1. There is confusion as to whether and /or which improvements will be public or <br />private. The Project Study Maps do not adequately indicate which will be private <br />drives and which will be public roads to NCDOT standards. Can this be clarified <br />on the Study Maps? <br />2. At the Citizen Informational Workshops there was some confusion and varying <br />comments from DOT staff and consultants concerning NCDOT construction <br />standards (right -of -way width, pavement width, drainage ditches, etc.). For <br />example, there was mention of right -of -way widths possibly being 50 feet rather <br />than 60 feet, and citizens' understanding of pavement widths varied as well. <br />Recognizing that the projects are still in their conceptual stages, please clarify to <br />the best of your ability the construction standards for these three projects. <br />