Orange County NC Website
Arts Commission Sprinkler and Structure Reimbursement Proposal <br /> Whitted Bldg A GSF 34,149 <br /> 1st Floor GSF 13,282 <br /> Arts Comm. GSF Proportion 38.89% <br /> Sprinkler$/SF' 6.88 <br /> Sprinkler Cost Share 91,397 <br /> (based on %GSF) <br /> Arts Comm. Sprinkler Reimbursement 91,397 <br /> 1st Floor Structural Steel Reimbursement 27,300 <br /> Total Reimbursement 118,697 <br /> 1.$224,988 Sprinkler Cost.plus$20,000 Sprinkler Design Cost,less$10,000 credit for avoided ground rated corridor/code costs. <br /> 0) <br />