Browse
Search
Minutes 10-25-2012
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2012
>
Minutes 10-25-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:12:42 AM
Creation date
1/30/2013 9:25:25 AM
Metadata
Fields
Template:
BOCC
Date
10/25/2012
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 10-25-2012 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 10-25-2012 - Work Session
Agenda - 10-25-2012 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 10-25-2012 - Work Session
Agenda - 10-25-2012 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 10-25-2012 - Work Session
Agenda - 10-25-2012 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 10-25-2012 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i� Option 1 <br /> Estimated Cost: <br /> �i $182 - $210 per square foot <br /> Advantages: <br /> �i More building for the money <br /> �i Maximum Design Flexibility <br /> �i Maximum Programming/Use Flexibility <br /> �i New Construction <br /> �i Fewer Unknowns <br /> i� Option 1 <br /> Estimated Cost: <br /> �i $182 - $210 per square foot <br /> Disadvantages: <br /> �i No presence of existing facility <br /> �i Loss of Historically and Culturally Significant Facility <br /> i� Option 2 <br /> 10,000 square foot community center <br /> �i Adaptive re-use of existing central portion of facility <br /> �i De-construct classroom wings <br /> ii, New Roof <br /> �i New Building Systems (Plumbing, Electrical, Mechanical) <br /> �i Standard Upfit <br /> Estimated Cost: <br /> �i $185 - $217 per square foot <br /> Advantages: <br /> �i Preservation of Cultural and Historical Significance <br /> �i Embodied Energy in Existing Facility re-use <br /> �i Reasonable Cost <br /> �i Elements of Existing Building to Remain <br /> i� Option 2 <br /> Estimated Cost: <br /> �i $185 - $217 per square foot <br /> Disadvantages: <br /> �i Significant Unknowns <br /> �i Restricted Design Flexibility <br /> �i Restricted Use and Programming Flexibility <br /> ii, Next Steps <br /> Discussion <br /> Preferences <br /> Timeline <br /> Design Professional Engagement (RFQ) <br /> Informal Resident Advisory Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.