Orange County NC Website
35 <br />this fee does not cover the service lines because those are typically installed at the developer's <br />expense). This fee would be paid at the same time as OWASA's availability fee — when a <br />connection is made. The District's policy could provide that the service line extension fee would <br />be waived for the first connection made to any property existing as of a specified date. <br />