Orange County NC Website
Estimate presented to Rogers Road Task Force on 06/06/12 <br />Blake Moving Company, Inc. submits the following estimate for the relocation of the Hogan- Rogers home <br />on Purefoy Drive. This estimate also includes site prep, footing, foundations, remodeling costs and <br />additions. <br />1. Relocation - Includes all prep work to prepare the dwelling for relocation. Relocation of the home with <br />the home being left in a level position over a footing at basement height. $39,860.00 <br />2. Grading for the route- Includes placement of a 2 foot pipe in a drain ditch. Placing compactable fill over <br />the pipe and adjacent area. Removal of debris from the route and existing site, including back room, trees, <br />and foundation debris. $11,160.00 <br />3. Excavation of topsoils at new site. Furnishing compactable fill to raise the house site up to 2.5 feet. <br />Compacting fill including engineering fees: $21,230.00 <br />4. Footings, foundations, basement slab- Footings — width 2', depth 10" (includes horizontal rebar). <br />Foundations include a 12" reinforced wall on the front and sides. Porch includes foundation from basement <br />depth due to compaction issues and relocation process. Front sidewalks included. French drains and <br />waterproofing. $60,243.00 <br />5. Backfill of topsoil against front and side walls. Side slopes to be tapered. $5,250.00 <br />6. Remove back porch Removal of debris included in 92. Remove vinyl siding, Remove shingle siding. <br />Putty all nail holes, repair lap siding, repair improper framing. $65,000.00 <br />7. Remove vinyl shingle siding, repair nail holes in lap siding, paint outside of dwelling $351000.00 <br />8. Remove roof — re -sheet and install new roof $40,000.00 <br />9. Restructure and rebuild front porch $15,000.00 <br />10. Replace windows $21,250.00 <br />11. New plumbing 3 levels $30,000.00 <br />12. Remove old plaster, install and finish sheet rock $40,000.00 <br />13. Repair and refinish all wood floors $20,000.00 <br />14. Allowance for appliances $30,000.00 <br />15. New cabinets throughout house $120,000.00 <br />16. New doors front and back $7.500.00 <br />17. New addition $80,000.00 <br />18. Mechanical (I IVAC, duct work, etc.) $48,000.00 <br />19. Electrical rewiring $51,000.00 <br />Total $740,499.00 <br />12 <br />22 <br />