Browse
Search
Agenda - 01-24-2013 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 01-24-2013 - Regular Mtg.
>
Agenda - 01-24-2013 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:52:19 PM
Creation date
1/18/2013 3:08:23 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 01-24-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 <br />Blake Moving Company, Inc. presented an estimate of $740,499 see Estimated <br />presented to Rogers Road Task Force below, for the relocation of the Hogan- Rogers <br />home to Purefoy Drive. Habitat has determined that the first two lots in the Phoenix <br />Place subdivision, which are at the corner of Purefoy Drive and Edgar Street, would be <br />the best location for the relocation of the structure. Blake presented examples of <br />historical structures that the company has successfully moved. <br />Blake's assessment of the historic home is that structure is sound, some repairs need to <br />be made after it is moved, and there will not be any issues with the relocation of the <br />home. An architect /engineer will have to be engaged to design the foundation of the <br />relocated structure and remodeling of the interior of the home. <br />St. Paul A.M.E. Church is completing the permitting and compliance phase of the <br />project and anticipates getting through that process by late fall. The Church will go <br />through the bidding process to select a site work contractor probably in late <br />August /early September. The site work would start the latter part of the year depending <br />on the weather. The phasing for building and construction for the buildings will not start <br />until the first of the next year at the earliest. <br />The Church will work with the Rogers Road Neighborhood to relocate the Hogan - <br />Rogers House. Gloria Shealy, Project Manager has requested a timeline to relocate to <br />the adjacent site. Because the Church is anxious to begin construction as soon as <br />possible, time is of the essence to relocate the Hogan- Rogers House. <br />Construction of a New Facility: <br />If it is not feasible or practicable to move and restore the Hogan- Rogers House, the <br />Historic Rogers Road Neighborhood Task Force is investigating the possibility of <br />constructing a new Community Center on the two lots donated by Habitat for Humanity. <br />Habitat will support the construction of a new facility if the facility is used as a center for <br />neighborhood programs and activities. The donated site could support a facility of up to <br />3,000 Sq. Ft. with an estimated budget of $500,000. Habitat's support for the community <br />center will be contingent on a commitment of funding allocated to the Rogers Road <br />Neighborhood to complete the project. <br />A proposed community center must meet NC State Building Code and obtain a Building <br />Permit. The Town of Chapel Hill advises consulting an architect /design professional on <br />the cost and specific code requirements. In addition, the site layout must receive zoning <br />approval and meet the Chapel Hill Land Use Management Ordinance requirements <br />regarding site layout and process. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.