Browse
Search
Agenda - 01-24-2013 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 01-24-2013 - Regular Mtg.
>
Agenda - 01-24-2013 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:52:19 PM
Creation date
1/18/2013 3:08:23 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 01-24-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost estimate Summary: <br />Engineering, Design and Permitting <br />376,350 <br />Construction Cost <br />3,763,506 <br />Construction Administration <br />188,175 <br />Construction Inspection <br />188,175 <br />20% Contingency <br />903,241 <br />Sub Total <br />5,419,447 <br />Service Availability Fees <br />368,768 <br />Total <br />5,788,215 <br />17 <br />The concept does not include the cost to actually connect individual homes to the sewer <br />system. Those costs will vary on the configuration of the lot and the distance from the <br />house to the main sewer line. Those costs are typically the costs of the homeowner <br />and are estimated to be about $20 /foot. The connections to an individual house would <br />be provided by a private plumbing contractor. <br />The next step to move the concept plan forward would be to begin the preliminary <br />engineering and design work. Engineers would be hired to take this concept, go out in <br />the field and start the process of data collection and defining the details of the concept. <br />OWASA has estimated the preliminary engineering costs would be $376,350. That is a <br />rough estimate based on what is known of the area so far. A completed preliminary <br />engineering and design will be necessary to complete a Community Development Block <br />Grant application. <br />Sewer Recommendations: <br />The Task Force has discussed all or part of the proposed $5.8 million dollar sewer <br />concept plan, but has not yet recommended moving forward with this concept plan, <br />pending an agreement on a cost sharing plan for sewer improvements. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.