Orange County NC Website
2 <br />• Conducted an on -line public survey (October — November 2009); Collected current traffic <br />data and projected future traffic (August 2010 — October 2010) <br />• Analyzed traffic growth rates to use in final data projections (November 2010) <br />• Prepared a highway deficiency analysis (November — December 2010) <br />• Held a public input meeting on the deficiency analysis (February 2011) <br />• Developed alternatives and draft recommendations for all modes (March- August 2011) <br />• Held public drop in session and collected County advisory board input (September 2011) <br />• Board of County Commissioners (BOCC) received draft CTP maps and provided input <br />(October 2011) <br />• Project delayed to rectify boundaries between the Burlington- Graham and Durham - <br />Chapel Hill - Carrboro Metropolitan Planning Organizations (January 2012 — November <br />2012. <br />• Orange County Planning staff reviewed a rough draft of the CTP report and <br />provided comments to NCDOT Transportation Planning Branch staff (December <br />2012). <br />• NCDOT Transportation Planning Branch staff revised draft Plan for public hearing <br />(January 2013). <br />OCTOBER 18, 2011 BOCC MEETING — The Orange County BOCC last discussed the CTP at <br />its meeting on October 18, 2011. All comments provided by the BOCC at that time have been <br />acknowledged and addressed in some manner by the draft CTP. Staff will include a brief <br />summary of how these items have been addressed during tonight's presentation. Minutes from <br />this meeting are provided as Attachment 1. <br />NEXT STEPS — Following tonight's public hearing on the 113 page CTP (Attachment 4), <br />Orange County will consider adoption in two parts: <br />Part 1 - adoption of Sheets 1 -5 (4 Maps), as provided in Attachment 5; and <br />Part 2 - adoption of the technical report (Attachment 4). It should be noted that Sheets <br />1 -5 (Attachment 5) can also be found within the technical report (Attachment 4), albeit at <br />a smaller, 8.5 x 11 page size. <br />Following is the anticipated schedule and sequence of events- <br />1 . Public Hearing (January 2013); <br />2. Orange Unified Transportation Board formal recommendations (February 2012); <br />3. BOCC consideration of Part 1 (March 2013); <br />4. TARPO endorsement of Part 1 (Spring 2013); <br />5. NCDOT Transportation Planning Branch staff recommendation of Part 1 to NCDOT <br />Board of Transportation (Spring 2013); <br />6. NCDOT Board of Transportation adopts only Part 1 (Spring 2013); <br />7. NCDOT Transportation Planning Branch distributes the technical report for external <br />review by other staff within NCDOT (local contacts and modal contacts), a designated <br />member of NCDOT Board of Transportation, TARPO, and Orange County (any <br />comments collected are to be forwarded to the BOCC); <br />8. NCDOT Transportation Planning Branch staff finalizes the report and distributes the final <br />document including previously adopted Map Sheets; and <br />9. BOCC consideration of Part 2 (May -June 2013). <br />