Browse
Search
Agenda - 01-24-2013 - 5o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2013
>
Agenda - 01-24-2013 - Regular Mtg.
>
Agenda - 01-24-2013 - 5o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2015 3:57:29 PM
Creation date
1/18/2013 2:24:35 PM
Metadata
Fields
Template:
BOCC
Date
1/24/2013
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5o
Document Relationships
Minutes 01-24-2013
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />"'Mc( -I Me <br />�Y <br />E _ <br />A S S O C I A T E S <br />December 17, 2012 <br />Mr, Jeff Thompson <br />Orange County <br />200 South Cameron Street <br />Hillsborough, North Carolina 27278 <br />RE: Proposal for Engineering Services <br />McGowan Creek Interceptor <br />Orange County, North Carolina <br />Dear Mr. Thompson: <br />Pursuant to your request, we are pleased to provide you with this proposal for <br />engineering services for the McGowan Creels Interceptor Project. We understand that the project <br />will be funded by NCDENR Infrastructure Finance Section. We further understand that the <br />project generally consists of the construction of approximately 2,420 linear feet of 12 -inch <br />gravity sewer along McGowan Creels from Cedar Grove Efland Road to the Brookhollow Pump <br />Station and abandonment of the existing McGowan Pump Station, all in the Efland area of <br />Orange County. <br />We anticipate providing the following Scope of Services: <br />Design and Permitting Phase <br />hase <br />❑ Consult with the OWNER to fully determine their requirements for the project and to <br />discuss the possible phasing, coordination, approvals and other preliminary matters. <br />❑ Coordinate and conduct coordination meetings with the OWNER as needed to establish <br />communication lines, meet with project team members, define project schedules and <br />gather initial data and information from the OWNER. <br />❑ Coordinate the provision of any subsurface investigation by others, if any, including <br />assisting with solicitations and preparing site maps identifying locations for testing. <br />❑ Prepare complete bid documents, contract documents, technical specifications and <br />construction drawings to detail the character and scope of the work of the Project as <br />determined in the Engineering Report. <br />E n g i n e e y i n g ® P l a n n i n g F i n a n c e <br />HcGill Associates, P.A. • P,O. Box 1136, Hickoi)� NC 28603 - 1240 19th St. Lane NH; Hickory, NC 28601 <br />Office; 828 - 328 -2024 - Fax; 828 - 328 -3870 <br />
The URL can be used to link to this page
Your browser does not support the video tag.