Orange County NC Website
1. Maintain or Promote the Public Health, Safety and General Welfare <br /> 2. Maintain or Enhance the Value of Contiguous Property <br /> 3. Be in Harmony with the Area in which it is Located and in Compliance wl <br /> Comprehensive Plan <br /> -- Special Uses 8.2.1 <br /> Buckhorn Village PD-ED, being located in the Buckhorn / 1-85 EDD and being Developed by <br /> the Proposed Guidelines will: <br /> 1. Provide a Safe, Sustainable Development that also Encourages Pedestrian Movement <br /> contributing to the Health of the General Public as well as Allow for a Government <br /> Services Site to Aid in Safety Needs <br /> 2. Maintain or Enhance Adjacent Property Values through the Quality of the Overall <br /> Development and the Nature of Tenants Recruited <br /> 3. Comply w/the Comprehensive Plan and All other Plans or Future Visions of Orange Co. <br /> for this Area. Will also set the Tone and Standard for Future Development that will Spur <br /> from BV-PD-ED. <br /> III'�IIIIIIIIIII IIIIW'' III '; SPECIAL USE REQUIREMENTS <br /> Before Issuance of Special Use Permit, Specific Standards to Be Addressed Are the Method <br /> and Adequacy of : <br /> 1. Provision of Water, Waste Water, and Solid Waste <br /> 2. Police, Fire, and Rescue Squad Protection <br /> 3. Vehicular Access to the Site and Traffic Conditions Around the Site <br /> 4. Other Use Specific Standards are set forth in Section 8.8 <br /> -- Special Uses 8.2.4 a-d <br /> Geof Gledhill asked if Tracy Parrott confirmed that he was sworn. Mr. Parrott confirmed that he <br /> had been sworn in. <br /> The Buckhorn Village PD-ED, has proposed and as shown on the following slides : <br /> 1. A Phased Utility Plan to Water and Waste Water Services through the Town of Mebane. <br /> Solid Waste will be handled through Orange County and the Solid Waste Ordinance. <br /> 2. Fire or Rescue Station SITE may be located wl in the Development and Police I Sheriff <br /> Patrols to be Coordinated Through the Town of Mebane and Orange County. <br /> 3. A Phased Traffic Improvement Plan to follow Recommendations of a Final DOT <br /> Approved Traffic Impact Analysis by Arcadis. <br /> 4. Other standards in Section 8.8.23 — Planned Developments defers to the Requirements <br /> of Article 7 — Planned Developments. <br /> Mr. Hutchins introduced Bob Miller, who continued with the presentation. <br /> Bob Miller: I have been sworn. I'm a licensed professional engineer in the State of North <br /> Carolina and have been an environmental consultant for 23 years, 19 of those years here in <br /> North Carolina. I have performed an environmental site assessment on the land in question. <br /> The site assessment was performed in accordance with the ASTM Standard E 1527-05, which <br /> is the accepted industry standard for performing environmental assessments. <br />