Browse
Search
2000 NS BOCC - Water and Sewer Boundary Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2000
>
2000 NS BOCC - Water and Sewer Boundary Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 11:00:28 AM
Creation date
12/31/2012 3:17:46 PM
Metadata
Fields
Template:
BOCC
Date
3/23/2000
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
2
Document Relationships
Agenda - 03-23-2000 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2000\Agenda - 03-23-2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y 17 <br /> FINAL <br /> 4/30/99 <br /> E. Siting of Essential Public Facilities Within Interest Areas <br /> The location of some essential public facilities, particularly <br /> schools, requires special consideration for access to public <br /> water and sewer lines. <br /> Where possible, schools shall be sited in a manner that <br /> promotes the efficient use of existing water and sewer service. <br /> Preferably, a set of criteria governing such situations would be <br /> developed based on consultations between the appropriate <br /> school boards and the elected officials of affected jurisdictions, <br /> and applied as necessary. . <br /> Publicly-owned facilities other than a public.school shall be <br /> located in a manner that promotes the orderly provision of <br /> water and sewer service. The preferred method of connection is <br /> to lines that already exist, or in a manner that would minimise <br /> the need to extend existing lines. <br /> F. Water and Sewer Service Into/Out of Orange County <br /> Recognizing the land use implications of public water and <br /> public sewer service in adjacent counties on jurisdictions <br /> within Orange County, water and sewer service of any of the <br /> service providers that are parties to this agreement shall not be <br /> extended outside of the boundaries of Orange County without <br /> the approval of the elected boards which exercise planning <br /> jurisdiction on either side of the County boundary. Any. <br /> extension of lines or service into Chatham Co uires the o� <br /> approval of Orange County, Chapel H llCCarrboro and OWA SA. <br /> This approval is not required when water and sewer service is <br /> required as a condition of annexation by.the towns of Chapel <br /> Hill or Carrboro. <br />
The URL can be used to link to this page
Your browser does not support the video tag.