Orange County NC Website
18 .i <br /> 200A 52. 00 78 . 00 <br /> 300A 65. 00 91. 00 <br /> 400A 78. 00 117. 00 <br /> 600A 98. 00 130. 00 <br /> 800A 130. 00 195. 00 <br /> 1000A 195.00 260. 00 <br /> 1200A 260.00 325. 00 <br /> 1400A 293 . 00 390. 00 <br /> 1600A 325. 00 520. 00 <br /> Over 1600A 33 . 00/100A 52 . 00/100A <br /> SCHEDULE I <br /> Plumbing <br /> New Construction or Fixture Replacement <br /> # Fixtures <br /> 1 7. 00 <br /> 2 10. 00 <br /> 3 14. 00 <br /> 4 17. 00 <br /> 5 21. 00 <br /> 6 and over 21. 00 <br /> + 4. 00/Fixture <br /> Mobile Home 10. 00 <br /> SCHEDULE J <br /> Residential Mechanical <br /> Any covered ductwork or component 60. 00 <br /> (Each system) <br /> Any exposed ductwork or factory assembled 40. 00 <br /> components (One system) <br /> Installation of each additional system 10. 00 <br /> Replacement of one system 40. 00 <br /> Mobile Home 10. 00 <br /> Multi-Family/Exposed ductwork 40. 00 <br /> (Per dwelling unit) <br /> Multi-Family/Covered ductwork 60.00 <br /> (Per dwelling unit) <br /> SCHEDULE K <br /> -41on-Residential/Commercial Mechanical <br /> Commercial Cooling with separate distribution system, including <br /> installation of a complete cooling system with the distribution <br /> system, condensor, receiver, cooling tower, or evaporative <br /> condensor coils and air handling units, etc. ) <br /> First Unit 40. 00 <br /> Each additional unit 10. 00 <br /> Replacement of a system 40. 00 <br />