Orange County NC Website
d <br /> Commercial Heating (Installation of a heating system including <br /> boiler, furnace, duct heater, unit heater, air handling units and <br /> air distribution system, etc. ) <br /> First Unit 40. 00 <br /> Each additional unit 10. 00 <br /> Replacement of a system 40. 00 <br /> Commercial heating and cooling (with combined system including <br /> the distribution system, boiler, furnace, ductwork, etc. ) <br /> First Unit 40. 00 <br /> Each additional unit 10. 00 <br /> Replacement of a system 40. 00 <br /> Commercial Ventilation and Exhaust Systems (includes fans, <br /> blowers and duct system for removal of dust, gases, fumes, <br /> vapors, etc. ) <br /> one system 40. 00 <br /> Each additional system 10.00 <br /> Hood fan commercial type cooking equipment 20. 00 <br /> Commercial range or grill (each unit) 20. 00 <br /> Deep fat fryer 20. 00 <br /> oven 20. 00 <br /> SCHEDULE L <br /> Joint Planning Inspection Fees <br /> All projects approved under the terms of the Joint Planning <br /> Agreement between orange County and the Town of Chapel Hill shall <br /> pay the following fees prior to the recording of a Special Use <br /> Permit or Final Plat of a major subdivision: <br /> Street and storm one percent (1%) of--the <br /> drainage improvements total construction cost of <br /> those improvements to be constructed <br /> to Town of Chapel Hill standards <br /> Water and sewer Two percent (2%) of the <br /> improvements total construction cost of <br /> those improvements to be constructed <br /> to Town of Chapel Hill standards <br /> Where projects- are to be built in phases, fees may be pro=rated <br /> based on the cost of improvements scheduled in each phase. <br />