Orange County NC Website
SCHEDULE OF STANDARD RATES <br /> I. CLASSIFICATION Hourly Rate <br /> A. Principal Engineer $100.00 <br /> B. Professional Engineer $ 85.00 <br /> C. Professional Land Surveyor $ 85.00 <br /> D. Designer/Project Engineer $ 70.00 <br /> E. Designer/Project Surveyor $ 70.00 <br /> F. Cadd Technician 1 $ 30.00 <br /> G. Cadd Technician 11 $ 40.00 <br /> H. Cadd Technician III $ 50.00 <br /> 1. Survey Crew(3 man) $110.00 <br /> J. Survey Crew(2 man) $ 90.00 <br /> K. Administrative/Clerical $ 35.00 <br /> L. Road Inspection $100.00 for the 1St 300 feet and $0.20 per foot thereafter <br /> 11. OTHER SERVICES—DIRECT EXPENSES Standard Rate <br /> A. Prints $ 2.00 each <br /> B. Vellums $ 4.50 each <br /> C. Computer Disk Mailings $ 3.50 each <br /> D. Photocopies $ 0.10 each <br /> E. Express Mail/Deliveries/Courier Cost plus 10% <br /> F. Vehicle Mileage $ 0.325/mile <br /> G. Outside Reprographic Services Cost plus 10% <br /> H. Outside Consultant Services Cost plus 10% <br /> 1. Topo,and Tax Maps Cost plus 10% <br /> 1. No additional charges for long-distance telephone calls or facsimiles. <br /> OCERCD Revised 2 <br /> February 28,2000 <br /> Page 2 of 4 <br />