Browse
Search
Agenda - 12-11-2012 - 5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 12-11-2012 - Regular Mtg.
>
Agenda - 12-11-2012 - 5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2015 3:24:05 PM
Creation date
12/7/2012 11:50:58 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes 12-11-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 18 <br /> AutoQuote 12.1 <br /> 3351 LOOSE EQUIPMENT to be provided by Excellance <br /> 3352 Price: <br /> 3353 Supply four Bowman#GB-003 glove box holders-loose equipment 137.21 <br /> 3354 Supply and install an InMotion system. The control box is to be mounted 2,772.03 <br /> 3355 behind the passenger's seat on the back wall and be wired battery hot. The 0.00 <br /> 3356 antenna is to be mounted on top of the cab. 0.00 <br /> 3413 <br /> 3414 CUSTOMER SUPPLIED PARTS <br /> 3415 <br /> 3416 It is Excellance policy for all parts to be supplied by Excellance. The reasons for this policy <br /> 3417 are to allow Excellance:(1)to better engineer and manufacture the vehicle by obtaining the <br /> 3418 parts in advance, (2)provide better control over tracking the delivery of all parts and getting the <br /> 3419 part to the correct vehicle for which it is intended, and (3)it allows Excellance to better adhere to <br /> 3420 its production schedule. Disruptions in our production schedule are very costly and wasteful in <br /> 3421 terms of labor. Therefore,exceptions to this policy will result in a charge of$250.00 per part <br /> 3422 supplied by any dealer or customer PLUS the appropriate labor charge for installing any such part. <br /> 3423 Note: Excellance does not warrant the installation of customer supplied parts installed by Excellance! <br /> 3424 Excellance waives the$250 "parts charge"for two-way radio equipment,radio antenna, and cots. <br /> 3425 <br /> 3426 FACTORY PAID TRANSPORTATION: OPTIONS <br /> 3427 It is Excellance's perference for the customer to make their own transportation arrangements. <br /> 3428 However, Excellance appreciates the"budgeting"requirements of some organizations and <br /> 3429 will be delighted to assist the customer with their transportation needs. Excellance has over <br /> 3430 25 highly customized vehicles in various stages of production at all times. Unfortunately,there <br /> 3431 are too many variables affecting the flow of production to allow Excellance to obtain the least expensive <br /> 3432 air fare with a"30-day advance purchase". This,combined with the impossibility of forecasting <br /> 3433 the future cost of airline tickets today, results in what may seem like an unusually expensive <br /> 3434 quote for airline tickets. Be assured Excellance will gladly refund any savings that may result <br /> 3435 from lower air fares. The transportation costs will be divided by the number of units ordered. <br /> 3436 However, the customer is responsible for paying the difference if <br /> 3437 fewer units are ordered than what is specified at line 236 <br /> 3438 <br /> 3464 Excellance will provide transportation,hotel,food and local ground transportation 1,000.00 <br /> 3465 for two OCES personnel to visit the plant for final inspection. 0.00 <br /> 3467 THE COMPLETED AMBULANCES SHALL BE DRIVEN TO OCES BY EXCELLANCE 0.00 <br /> 3468 DRIVERS TO THE ADDRESS OF THE OCES PERSONNEL'S CHOICE UPON COMPLETION <br /> 3469 Payment Terms: <br /> 3470 <br /> 3471 Payment to be Cash Upon Delivery F.O.B. Excellance,Madison,Alabama. <br /> 3472 <br /> 3483 <br /> 3486 Payment to be net 15, FOB: Hillsborough, NC <br /> 3487 <br /> 3488 <br /> 3491 <br /> 3492 Specify to whom the MSO is to be assigned: <br /> 3493 <br /> 3495 The vehicle will be ready for delivery with electrical diagrams,cleaned, inspected,fuel tanks full, <br /> 3496 vehicle serviced,certified weight ticket, and copies of all warranties and owners manuals. <br /> 3497 <br /> 3498 ADDITIONAL TERMS AND CONDITIONS FOR THIS CONTRACT <br /> 3499 <br /> 3500 The effective date of this contract is the day this order is accepted by Excellance as <br /> 3501 evidenced by the date this contract is executed by an officer of Excellance. <br /> 3502 <br /> 3503 Construction will begin only after all questions have been resolved. Once the unit is in production, <br /> 3504 each change will result in an engineering fee of$250 in addition to the price for the change. <br /> 3505 <br /> Page 16 9/4/2012 1:41 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.