Browse
Search
2012-412 Solid Waste - W L Bishop Construction Inc Bid Award: Walnut Grove Church Road Solid Waste Convenience Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2012
>
2012-412 Solid Waste - W L Bishop Construction Inc Bid Award: Walnut Grove Church Road Solid Waste Convenience Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2012 10:11:31 AM
Creation date
12/5/2012 9:53:57 AM
Metadata
Fields
Template:
BOCC
Date
8/21/2012
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
5m
Document Relationships
2012-412 S Solid Waste - W L Bishop Construction Inc Bid Award: Walnut Grove Church Road Solid Waste Convenience Center $27,438
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. <br /> Project Name: Walnut Grove Convenience Cantor Ekparadon MDR Propel No. 350207-142839-018 <br /> Project Owner Orange County owners Project No.: <br /> Dab of Issuance: November 20,2012 <br /> Project Contractor: Dab of Contract: August 21,2012 <br /> W.L.Bishop Construction Co. Original Context Price: $887,092.00 <br /> 2211 Leah Drive <br /> HilWxxwAh,NC 27278 Original Contract Period: 120 days <br /> It is agreed to modify the Contract referred to above as follows: <br /> Item No. Item and Description of Changes Contract Price Contract Time <br /> Decrease Increase Decrease Increase <br /> 1 Remove unsuitable soils,1614 c $171 $27.436 WA WA <br /> Sub-Total $27A6 <br /> Difference Net $27.438 <br /> Summary: It is agreed to modify the Contract referred to above as follows: <br /> Contract Price prior to this Change Order Contract Time prior to this Change Order <br /> $887,092.00 120 Days <br /> Net Contract Price Increase(Deersase)of this Charge Order Net Contract Time Increase(Decrease)of this Change Order <br /> $27,438.00 NIA <br /> Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders <br /> $914,530 I N/A I <br /> The changes included in this Change Order are to be accomplished in accordance with the terms,stipulations and <br /> conditions of ginal Contract as though included therein. <br /> Acasiffed f6r-Cofitraclor : pate <br /> "n'- -�t.� I I t"�A//4 I <br /> 1pkomm <br /> ended 77 O Engineering,Inc.of the Carolinas) Date <br /> Z- <br /> Approved for owner by: Attest Date <br /> Distribution: �X Owner I XI Contractor IX �Oifice ( (Field I (Other <br /> This instrument has been pre-audited in the u `—J <br /> manner required by the Local Government <br /> Budget and Fi I C trol Act CHANGORD.00C <br /> Clarence G. Grier,Assistant Co. Manager& <br /> CFO <br />
The URL can be used to link to this page
Your browser does not support the video tag.