Orange County NC Website
18 <br /> Estimate presented to Rogers Road Task Force on 06/06/12 <br /> Blake Moving Company,inc.submits the following estimate for the relocation of the Hogan-Rogers home <br /> on Purefoy Drive,T7iis esfimate also includes site prep,footing,foondations,remodeling costs and <br /> additions. <br /> 1.Relocation-Includes all prep work to preparc the dwcllnig for relocation.Relocation of the home�vith <br /> the home being left in a level position over a footing at basement height. $39,860.00 <br /> 2.Grading for the route-Includes placement of a 2 foot pipe in a drain ditch.Placing compactable fill over <br /> the pipe and adjacent area.Removal of debris from the route and e�sting site,including back roorn,trees, <br /> and foundation debris. $11,160.00 <br /> 3.Escavation of topsoils at ncw site.Furnishing compactable fill to raise the house site up to 2.5 feet. <br /> Compactina fill includina engineering fees: $Z 1,230.00 <br /> 4.Footings,foundauons,basement slab-Footings—width 2',depth 10"(uicludes horizontal rebar). <br /> Foundations include a 12"reinforced wall on the front and sides.Porch includes foundation from basement <br /> depth due to compaction issues and relocation process.Front sidewalks included.French drains and <br /> wxterproofmg. $60,243.00 <br /> 5.Backfill of topsoil against front and side walls.Side slopes to be tapered. $5,250.00 <br /> 6.Rcmove back porch Removal of debris iucluded in�2.Remove vinyl siding,Remove shingle siding. <br /> Putty all nail holes,repair lap siding,repair improper framing. $65,000.00 <br /> 7.Remove vinyl shingle siding,repair nail holes in lap siding,paint outside of dwclling $35,000.00 <br /> 8.Remove roof—re-sheet and install new roof $40,OD0.00 <br /> 9.Restructure and rebuild front porch $15,000.00 , <br /> 10.Replace windows $21,250.00 ' <br /> ll.New plumbing 3 levels $30,000.00 <br /> 12.Remove old plaster,install and fmish sheet rock $40,000.00 <br /> 13.Repair and refinish all wood tloors $20,000.00 <br /> 14.Allowance for appliazices $30,000.00 <br /> 15.New cabinets througJiout housc $120,000.00 <br /> 16.New doors front and back $7,500.00 ' <br /> 17.New addifion � $80,000.00 � <br /> l8.Mecha�ical(]IVAC,ductwork,etc.) $48,000.00 ��� <br /> 19.Elcch-ical rewiring $51,000.00 I <br /> Total $740,499.00 <br /> ZZ <br />