Orange County NC Website
Article 5: Uses 16 <br /> Section 5.10:Standards for Telecommunication Facilities <br /> (4) Any wireless support structure less than 459-200 feet in height on which the <br /> owner of such facility permits the County to collocate its wireless facilities on the <br /> structure at no charge to the County when the location of such facility is of benefit <br /> to the County as determined in the sole discretion of the County. 14 <br /> (5) A written decision approving or denying an application for administrative approval <br /> of a telecommunication facility under this section shall be issued no later than 45 <br /> days following the submission of a complete application. <br /> (6) Collocation applications meeting the following requirements: <br /> (a) The proposed additional facility will not increase the overall height and <br /> width of the tower or wireless support structure to which the wireless <br /> facilities are to be attached. <br /> (b) The proposed additional facility will not increase the ground space <br /> approved in the site plan for equipment enclosures and ancillary <br /> facilities. <br /> (c) The proposed additional facility will comply with applicable regulations, <br /> restrictions, or conditions, if any, applied to the initial wireless facilities <br /> placed on the tower or other wireless support structure. <br /> (d) The proposed additional wireless facilities comply with all federal, State, <br /> and local safety requirements. <br /> (e) The proposed additional facility does not exceed the applicable weight <br /> limits for the wireless support structure. <br /> (B) Submittal Requirements <br /> All applications for telecommunication facilities that are eligible for administrative <br /> approval shall be submitted and reviewed in accordance with the standards of Section <br /> 5.10.8 of the Ordinance. <br /> deemed nmmplete: <br /> 0) Payment of all @PPI*Gable fees Fecluired by SeGtien 5.1 Q.7(D) of this OrdiRanGe <br /> application. <br /> Wireless supPArt StFUGture shall be m inn d in a safe rnanReF, and <br /> autheFized to do business in the State, and if the appli I . #ity, the <br /> . <br /> pp1Ga f, tuthqrIt <br /> 16 <br /> (4) A site plan pFepared iR aGGGrdaRGe with SeGtiGR 2.5 of this QrdinaRGe ShC)WiRg <br /> r <br /> 14 Modifications to Section(s)5.10.6(3)and(4)are intended to keep the administrative approval of <br /> telecommunication support structures <br /> 15 The regulations contained in Section 5.10.6(B)are the same as those detailed in Section 5.10.8(A). Also staff <br /> believes that we need a central section for all submittal/review criteria rather than have it in multiple sections of the <br /> UDO. All submittal/review requirements are now in a central section. The item is shown as being deleted as we are <br /> already repeating the same standards in Section 5.10.8(A). Staff does not believe it is necessary to repeat the same <br /> standards over and over again. <br /> 16 This specific standard,denoted in green;*..:1-n� ° g4-text,has been relocated to Section 5.10.8(A) <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-77 <br />