Browse
Search
ORD-2012-017 Review of Proposed UDO Text Amendment(s) – Telecommunications
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2012
>
ORD-2012-017 Review of Proposed UDO Text Amendment(s) – Telecommunications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:43:22 PM
Creation date
11/29/2012 11:07:50 AM
Metadata
Fields
Template:
BOCC
Date
5/1/2012
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
6a
Document Relationships
Agenda - 05-01-2012 - 6a
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 05-01-2012 - Regular Mtg.
Minutes 05-01-2012
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses 50 <br /> Section 5.10: Standards for Telecommunication Facilities <br /> 'pgli ode a statement that the.agility and its <br /> neRt Will GOMPly With all federal, state and lnr,;;l tzmk; <br /> T <br /> VT "`F" M`.`y nZTV1TQViQLfOTI-CCP TJ <br /> The cSpesial Use Permit shall iRdude^Gondition that the e!eGtFo <br /> magnetiG radiation levels maintaiR GGmpliaFlGe with requirements <br /> 06) Within 30 days of installation Gf equipment on the tower, and <br /> withiR 30 days of the installatiGR of aRy additiGnal equipment in <br /> the future, the tower owner shall provide dOGUmentatien e <br /> emossion levels on relation te F=(;G standards. <br /> 1 AA <br /> eMiSSOGR levels within five working days if se request( by <br /> Orange r <br /> (iV) OraRge Gourity may make SUGh requests at any tome Rot to <br /> evoeed twe times per year , <br /> /W\ "High "Ne n and Other&kjps <br /> "HIGH(i) if high voltage is neGessaFy for the GperatiOR of the <br /> VOLTAGE warning GigRS shall be peFmaRei4y <br /> attaGhed to the feRGe or wall and shall be SpaGed no more than <br /> DANGER" <br /> 4�0 feet apaFt_ <br /> "NO TRESPASSING" <br /> attaGhed to the feRGe or wall and shall be SpaGed Re rneFe thaR <br /> it n feet apaFt. <br /> The letters for the"HIGH VOLTAGE DANGER"and"PK) <br /> TRESPASSING"warning sig shall be at I + ..,hes in <br /> height. The two warning SigRS may be Gembined iRtG <br /> The warning signs shall he installed at least f' f + I +t. <br /> finished grade of the fenGe be GbstFuGted by <br /> (iv) The WaFRiRq SigRS may be attaGhed to freestanding poles the <br /> GE)Rtent of the 6igRS would, or ' <br /> rand <br /> be attaGhed to the tGweF StFUGWFe in GOMpliaRGe with federal <br /> Fegulatien- <br /> M FaGilitieG shall Gentain a sign no larger than fGuF square feet to <br /> previde adequate n0tifiGatien to persons in the immediate area G <br /> FadiatieR within a given area- <br /> (Vi) A SigR RG larger than four square feet GontaiRiRg the name(s) e <br /> ernergenGy phone number(s) shall be iRstalled. The sign shall <br /> be GR the equipment shelter OF Gabinet of the appliGaRt and be <br /> visible freFn the aGGess PGiRt Gf the site and must identify the <br /> (Viq) OR tower sites, an FGG registration sigR, as appliGable, is also to <br /> be pFe6ent. The GigRG shall RGt be lighted, unless appliGable law, <br /> rule or regulation elation req sire lightiRg. <br /> shall be stFiGtly prohibited. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.