Orange County NC Website
Article 5: Uses <br /> Section 5.10: Standards for Telecommunication Facilities 41 <br /> f. The Inspections Division shall be notified in writing when <br /> a required analysis is complete. A copy of the analysis <br /> report shall be made available to the County Inspections <br /> Division upon request. That report shall also give details <br /> of the net result of any changes made to the tower or its <br /> appurtenances since the last inspection. <br /> (2) Fees and GhaFges <br /> (a) A filing fee as set by the 99@Fd Gf County Ge 3hall be Paid <br /> PeFmit. in addition, an inspeGtiGn fee is due the County at the time G <br /> (b) RHbIiG Iand OF Fight of way lease agFeements shall be established by <br /> Pe <br /> T�.F'rAits TTI'CJ: <br /> determine+the am <br /> faGilities and'SUPPOFt StFUG F $ The foregoing dGec not prohibit the <br /> fee shall be sepapately identified disq-1-n-se-d to the appiiGaRt UPOR <br /> Fequest. A partial eSGFGW payment Gf$1,000 shall be submitted at the <br /> $1;090 partial paymeRt aFnOURt. ARY unused funds iR the aGGGuRt afteF <br /> be Fetumed to the designated paFtym- <br /> ,2Z <br /> (3) Overall Rolliry and -Desired Goals <br /> ♦rnpF&6t*Gable; af <br /> 16 Moved to a new central section of the code as part of the proposed re-formatting. <br /> 27 Moved to a new central section of the code. No modification of existing development standards were proposed <br /> for the Special Use Permit process other than the allowable height for each category(i.e. Class A versus Class B) <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-102 <br />