Browse
Search
ORD-2012-053 Approval of Budget Amendment #4b for Upgrade Audio Visual Equipment at SHSC
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2012
>
ORD-2012-053 Approval of Budget Amendment #4b for Upgrade Audio Visual Equipment at SHSC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 3:57:55 PM
Creation date
11/27/2012 3:15:14 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5h
Document Relationships
Agenda - 11-20-2012 - 5h
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2012\Agenda - 11-20-2012 - Regular Mtg.
Minutes 11-20-2012
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Sound Advice of Eastern NC Inc PROPOSAL <br /> Worthington Road <br /> PO Box 270 DATE QUOTATION- <br /> Winterville,NC 28590 <br /> 252 355-1111 1019/2612: 4609 <br /> NAME/ADDRESS <br /> Orange County <br /> PO Box 8181 <br /> 131 W.Margaret Lane <br /> Hillsborough,NC 27278 <br /> TERMS REP PROJECT <br /> Due on receipt DER - <br /> QTY ITEM DESCRIPTION COST Total <br /> LEIGHTR.ONICS HEAD END <br /> 1 UltraNexus 2 Channel Video Player with Internet Streaming 12,701.98 12,701.98T <br /> Encoder <br /> 2 LGX-lTBR-D 1 Terabyte USB RAID External Hard Disc 999.00 1,998.00T <br /> Array(Rack Mountable)for Use with NEXUS, <br /> UltraNEXUS,UltraNEXUS-SDI,and <br /> EMLNENCE-HD2 <br /> I DV-DOIU l-rackspace DVD Player w1RS-232 Control 558.99 558.99T <br /> Port•Defeatable on-screen guide icons•HDMI <br /> Out•Optical out <br /> 1 LGX-DVply Interface cable for Tascam DV-DO IU 58.50 58.50T <br /> 1 Total Info Video Content Service Annual Fee(Included 0.00 O.00T <br /> free of Charge 1 st year) <br /> 1 W&C Wire and connectors 250.00 250.00T <br /> I LABOR Installation 1,926.67 1,926.67 <br /> 1 LABOR Training&Programming 1,341.21 1,341.21 <br /> 1 SHIPA4AND Shipping charges 250.00 250.00T <br /> Subtotal of above: 19,085.35 <br /> Sates Tax (7.0%) <br /> The information herein constitutes a design.Any unauthorized use or dissemination of the <br /> contents is prohibited. Total <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.