Orange County NC Website
<br />the project) and authorized the Purchasing Director to execute the paperwork as may be <br />required. <br />~ Contract with Corley Redfoot Zack for Engineering and Design Services for Fairview <br />Community Park <br />This item was removed and placed at the end of the consent agenda far separate consideration. <br />r. Consultant Services to Determine Topographic Elevation Data <br />The Board authorized the selection of Greenhorne and O-Mara to complete the elevation <br />certificate surveying work for a sum not to exceed $14,000 for Phase I and, if so funded in FY <br />2007-08, to proceed to Phase II work not to exceed $13,000. <br />s. Consultant Services, Clarion Associates -Comprehensive Plan Update <br />The Board approved a contract with Clarion Associates to provide services during Phase II of <br />the Comprehensive Plan Update process and authorized the Chair to sign. <br />t. Legal Advertisement for Quarterly Public Hearing -August 27, 2007 <br />This item was removed and placed at the end of the consent agenda far separate consideration. <br />u. US 70/Cornelius Street Corridor Strategic Plan <br />This item was removed and placed at the end of the consent agenda for separate consideration. <br />v. Chapel Hill Joint Planning Transition Area Zoning Atlas Amendment -Homestead <br />Twin Towns (JPA-CH-Z-1-07) <br />This item was removed and placed at the end of the consent agenda for separate consideration. <br />w. Schools Adequate Public Facilities Ordinance (SAPFOI-Approval of Annual 2007 <br />Report <br />The Board approved the 2007 SAPFOTAC Report related to various aspects of Orange County <br />Schools (OCS} and Chapel Hill - Carrboro City Schools (CHCCS}, as outlined in the draft <br />Annual Report of the SAPFO Technical Advisory Committee (SAPFOTAC} and the incorporated <br />forms. <br />x. Approval of Financing Arrangement for Efland Volunteer Fire Company, Inc. to <br />Purchase a Fire Engine Truck <br />The Board approved Efland Volunteer Fire Company, Inc.'s purchase of a fire truck; <br />appropriated $30,000 from the department's unappropriated fund balance; and authorized the <br />Chair to sign the appropriate documents related to the financing arrangement. <br />~ NC State Firemen's and Rescue Squad Annual Certification Roster <br />The Board approved the certification requirements for the fire marshal and assistant fire marshal <br />to participate in the North Carolina State Firemen's Association for the year 2006 and <br />authorized the Chair to sign. <br />z. Authorization for Emergency Services to Apply for 2007 COPS Technology Grant with <br />the City of Durham <br />The Board authorized the Division of Emergency Services to apply for Interoperable <br />Communications Equipment as asub-applicant from the City of Durham. <br />aa. Pyrotechnics Permit -Orange Speedway <br />The Board approved a pyrotechnics permit for Orange County Speedway for July 7, 2007 and <br />authorized the staff to execute permits as needed. <br />The Board approved a contract with Summit Engineering, Hillsborough, North Carolina to <br />perform construction materials testing and construction observation in conjunction with the <br />Justice Facilities Expansion Project and authorized the Manager to sign. <br />cc. 9-1-1 Center Authorization for Construction-Manager-at-Risk <br />The Board authorized the upfit of the proposed 9-1-1 Center at 510 Meadowlands Drive, <br />Hillsborough using the Construction Manager at Risk (CMAR} method of contracting. <br />