Browse
Search
Agenda - 11-20-2012-13 (4)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-20-2012 - Regular Mtg.
>
Agenda - 11-20-2012-13 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 4:31:42 PM
Creation date
11/16/2012 4:31:41 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item 4
Document Relationships
Minutes 11-20-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EYMIT A <br /> DRAFT <br /> Eno EDD Water and Sewer System Project <br /> City of Durham,North Carolina <br /> (Project No. 1 <br /> Scope of Work <br /> Introduction <br /> The City of Durham is collaborating with Orange County to provide water and sewer service to <br /> the Eno Economic Development District(EDD)to support economic viability and sustainable <br /> growth in the area Figure 1 shows the Eno EDD boundary included in this Scope of Work.The <br /> first phase will include development of a Master Plan.The second phase will include <br /> development of a more detailed hydraulic model of the downstream basins in Durham's system <br /> to assess the capacity improvements required in Durham's system considering other future flows <br /> and UI as well. Design,permitting,construction,and closeout services will follow. <br /> The overall project includes the following Phases: <br /> 1. Master Planning <br /> a. Kickoff Meeting and Data Collection <br /> b. Flow Projections <br /> c. Proposed Water and Wastewater Infrastructure within Eno EDD <br /> d. Force Main Discharge Alternatives <br /> e. Permit Agency Coordination <br /> f. Cost Estimates <br /> g. Master Plan Report <br /> 2. Detailed Hydraulic Analysis <br /> a. Data Collection <br /> b. Hydrologic Model Development <br /> c. Flow Projections <br /> d. Hydraulic Model Development <br /> e. Model Calibration <br /> f Capacity Analysis <br /> g. Improvement Alternatives Analysis <br /> h. Draft and Final Reports <br /> 3. Design <br /> 4. Permitting <br /> 5. Construction Services/inspection <br /> 6. Start-up,Testing,Record Drawings and Closeout <br /> This initial Scope authorization includes Phases 1 and 2. At their conclusion,the City intends to <br /> amend this Agreement to authorize the Consultant to perform Phases 3,4,5,and 6. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.