Browse
Search
Agenda - 11-20-2012-13 (4)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-20-2012 - Regular Mtg.
>
Agenda - 11-20-2012-13 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 4:31:42 PM
Creation date
11/16/2012 4:31:41 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
Information Item 4
Document Relationships
Minutes 11-20-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Information Item <br /> ORANGE COUNTY PLANNING & INSPECTIONS DEPARTMENT <br /> Craig N. Benedict, AICP, Director <br /> Administration �'L Aat,+r6°$� <br /> 131 W. Margaret Lane <br /> (919) 245-2575 MR Suite 201 <br /> (919) 644-3002 (FAX) ' <br /> P. O. Box 8181 <br /> www.co.orange.nc.us <br /> Cate �= Hillsborough, NC 27278 <br /> 6 " <br /> MEMORANDUM <br /> TO: Frank W. Clifton, Jr., Orange County Manager <br /> Board of County Commissioners <br /> FROM: Craig N. Benedict, AICP, Planning & Inspections Director <br /> DATE: November 20, 2012 <br /> SUBJECT: Eno Economic Development District Engineering Progress Update <br /> ATTACHMENT: Exhibit A— Draft Eno EDD Water& Sewer System Project <br /> City of Durham— Scope of Work <br /> This memo serves as an update of the utility engineering work in progress with the City <br /> of Durham in the Eno EDD area. The interlocal utility service agreement was adopted <br /> in January of this year. Monies funded from the '/ cent sales tax became available as <br /> noted in the CIP and 2012-13 budget as of July 1, 2012. <br /> A Request for Qualifications (RFQ) was distributed over the summer seeking qualified <br /> engineers. Top prospective firms were chosen and presentations were made in early <br /> fall. <br /> The scope of work has been refined with the lead firm to include two phases; first, a <br /> master planning element to determine, area, capacity needs, detailed hydraulic analysis <br /> and best connections back to Durham infrastructure, and second, engineering design <br /> and permitting with other engineering services as necessary. Orange County Planning <br /> and Engineering Staff has been constantly involved in this process as outlined in the <br /> agreement. Durham City is the lead and will be bringing contracts forward to their <br /> council in December. After confirmation, we will further inform the Board of specifics <br /> including timeline and cost. <br /> If you have questions in the interim, please call my office. <br /> Thank you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.