Orange County NC Website
Attachment 6 83 <br /> Approved 11/7/12 <br /> EXCERPT-APPROVED PLANNING BOARD MINUTES <br /> MINUTES <br /> ORANGE COUNTY PLANNING BOARD <br /> OCTOBER 3,2012 <br /> REGULAR MEETING <br /> MEMBERS PRESENT: Larry Wright (Chair), At-Large, Cedar Grove Township; Peter Hallenbeck (Vice-chair), Cheeks <br /> Township Representative; Maxecine Mitchell, At-Large Bingham Township; Alan Campbell, Cedar Grove Township <br /> Representative; Buddy Hartley, Little River Township Representative; Rachel Hawkins, Hillsborough Township <br /> Representative; Dawn Brezina, Eno Township Representative;Tony Blake, Bingham Township Representative <br /> MEMBERS ABSENT: Lisa Stuckey, Chapel Hill Township Representative;Johnny Randall,At-Large Chapel Hill Township; <br /> Andrea Rohrbacher,At-Large Chapel Hill Township; <br /> STAFF PRESENT: Craig Benedict, Planning Director; Michael Harvey, Current Planning Supervisor; Perdita Holtz; Special <br /> Projects Coordinator; Abigaile Pittman, Land Use/Transportation Planner ll; Tom Altieri, Comprehensive Planning <br /> Supervisor;Jennifer Phillips, Property Development Specialist;Tina Love,Administrative Assistant II <br /> OTHERS PRESENT: Paul Baker, Ryan M.Jackson,Jeff Akin,Chad Abbott <br /> Agenda Item 8: Zoning Atlas Amendment — To make a recommendation to the BOCC on an application to <br /> rezone approximately 14 acres of a 36 acre parcel of property located at 9925 NC Highway 57 <br /> from Agricultural Residential (AR) to NC Highway 57 Speedway Area Rural Economic <br /> Development Area (REDA-CZ-1). This item was heard at the August 27, 2012 quarterly public <br /> hearing <br /> Presenter: Michael Harvey,Current Planning Supervisor <br /> Alan Campbell returned to the table and rejoined the Planning Board Meeting <br /> Michael Harvey: Reviewed abstract. <br /> Michael Harvey: Mr. Chandler has requested that if a well is required that it be installed in Phase 2 and he understands <br /> he is responsible for bringing in water to clean and maintain the landscape until Phase 2 is built. <br /> Larry Wright: Where will he put that water? <br /> Michael Harvey: Into water plants and clean buildings with a pressure washer. <br /> Larry Wright: To get emergency vehicles around this water that is stored. <br /> Michael Harvey: It would not be permanent but be brought in a vehicle or truck for watering the plants or cleaning the <br /> facilities. <br /> Buddy Hartley: Why does he need to wait until Phase 2? <br /> 1 <br />