Orange County NC Website
76 <br /> AREA OF COMMENTS: APPLICANT BOCC PLANNING <br /> CONCERN: RESPONSE: RESPONSE: BOARD <br /> Includes comments RESPONSE: <br /> made during, and staff <br /> comments identified <br /> within the abstract for, <br /> the August 27, 2012 <br /> Quarterly Public <br /> Hearing <br /> LAND USE BUFFER BOCC members asked Staff completed a site <br /> Continued staff to complete a field visit on September 7, <br /> survey on an adjoining 2012 and determined <br /> residentially zoned the property is <br /> property to verify if it undeveloped. <br /> was undeveloped at this <br /> time. <br /> STORMWATER BOCC members wanted The site plan has At its September At its October 3, <br /> additional explanation been revised to 18, 2012 regular 2012 regular <br /> from the applicant on denote the proposed meeting, the meeting, the <br /> the proposed stormwater BOCC indicated Planning Board <br /> stormwater management system. they were indicated they <br /> management system. satisfied with the were satisfied with <br /> This system has been modifications. Mr. Hackett's <br /> BOCC and Planning deemed adequate by comments. <br /> Board members County Erosion Please refer to <br /> requested additional Control staff. Attachment 3 for <br /> detail on the site plan an e-mail from <br /> denoting drainage Terry Hackett of <br /> points on the property. Orange County <br /> Erosion Control <br /> This request was made tentatively <br /> after the project approving the <br /> engineer indicated the revised <br /> property would actually stormwater <br /> drain from multiple management <br /> locations due to existing system. <br /> and proposed <br /> topography. <br />