Browse
Search
Agenda - 11-20-2012 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-20-2012 - Regular Mtg.
>
Agenda - 11-20-2012 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 4:20:30 PM
Creation date
11/16/2012 4:20:07 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 11-20-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-055 Ordinance Amending the Zoning Atlas - Darrell Chandler Conditional Zoning to REDA-CZ-1
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
RES-2012-102 Resolution Concerning Statements of Consistency of a Proposed Zoning Atlas Amendment with Adopted Orange County 2030 Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2012
RES-2012-103 NO ACTION - Resolution Concerning Statement of Consistency of a Proposed Zoning Atlas Amendment - Darrell Chandler Conditional Zoning to REDA-CZ-1
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
72 <br /> AREA OF COMMENTS: APPLICANT BOCC PLANNING <br /> CONCERN: RESPONSE: RESPONSE: BOARD <br /> Includes comments RESPONSE: <br /> made during, and staff <br /> comments identified <br /> within the abstract for, <br /> the August 27, 2012 <br /> Quarterly Public <br /> Hearing <br /> TRANSPORTATION BOCC members After reviewing At its September At its October 3, <br /> Continued expressed concerns pictures of the area 18, 2012 regular 2012 regular <br /> over existing, mature, where the proposed meeting, the BOCC meeting, the <br /> foliage near the driveway shall be indicated they were Planning Board <br /> proposed entrance and located (Refer to satisfied with the indicated they <br /> asked for clarification if Attachment 2) modifications. were satisfied <br /> the existing trees would Planning staff with the <br /> block visibility or create determined during the modifications. <br /> a hazard for large September 7, 2012 <br /> vehicles attempting to meeting the drive <br /> access the site. location was <br /> acceptable and the <br /> foliage should not be <br /> an issue. <br /> UTILITY SERVICE <br /> County Planning staff BOCC members Please refer to At its October 3, <br /> comments were requested written Attachment 1 of the 2012 regular <br /> outlined at August documentation from November 20, 2012 meeting, the <br /> 27, 2012 public Orange County Health packet for additional Planning Board <br /> hearing and Building Inspections detail. indicated they <br /> that a chemical or other were satisfied <br /> toilet system could be with the <br /> used to support the information <br /> proposed office use. provided by the <br /> applicant. <br /> BOCC and Planning The applicant is At its September At its October 3, <br /> Board members making the necessary 18, 2012 regular 2012 regular <br /> expressed reservations application to the meeting, the BOCC meeting, the <br /> over the applicants Orange County Health asked for Planning Board <br /> desire not to develop a Department to correspondence voted <br /> well on the property. investigate the from Environmental unanimously to <br /> placement of a well on Health on well recommend the <br /> Several comments were the property. permitting imposition of a <br /> made over the need for procedures and condition <br /> a well to provide water Additional information costs. requiring the <br /> for staff, to clean the concerning this item is installation of a <br /> facility, and to address contained within well prior to the <br /> emergencies. Attachment 1. commencement <br /> of Phase 2 <br /> construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.