Orange County NC Website
70 <br /> Attachment 4 <br /> Synopsis of review comments/concerns related to Darrell Chandler project - request to <br /> rezone a 12 acre portion of a 35.8 acre parcel of property to the NC Highway 57 <br /> Speedway Area Rural Economic Development Area (REDA-CZ-1) Conditional Zoning <br /> district. <br /> AREA OF COMMENTS: APPLICANT BOCC PLANNING <br /> CONCERN: RESPONSE: RESPONSE: BOARD <br /> Includes comments RESPONSE: <br /> made during, and staff <br /> comments identified <br /> within the abstract for, <br /> the August 27, 2012 <br /> Quarterly Public <br /> Hearing <br /> TRANSPORTATION <br /> The turn radius for the Turn radius has been At its September At its October 3, <br /> County Planning staff access drive to the site increased to address 18, 2012 regular 2012 regular <br /> comments were is not adequate for this concern. Orange meeting, the BOCC meeting, the <br /> outlined at August turning movements of County staff met with indicated they were Planning Board <br /> 27, 2012 public larger vehicles, vehicles the applicant on satisfied with the indicated they <br /> hearing with trailers or September 7, 2012 to modifications. were satisfied <br /> emergency vehicles. review a revised plan with the <br /> calling for the increase modifications. <br /> in turn radius around <br /> proposed storage <br /> buildings as well as <br /> the reduction in size of <br /> proposed buildings to <br /> ensure adequate <br /> travel way for <br /> vehicles. <br /> Drive-aisle, including Drive-aisle width has At its September At its October 3, <br /> those areas in between been increased to 24 18, 2012 regular 2012 regular <br /> proposed units, are feet. The central meeting, the BOCC meeting, the <br /> insufficient to allow for drive-aisle has been indicated they were Planning Board <br /> two-way traffic. increased to 25 feet to satisfied with the indicated they <br /> accommodate modifications. were satisfied <br /> One-way traffic is Planning and with the <br /> recommended around Emergency modifications. <br /> the proposed storage Management staff <br /> units. recommendations. <br />