Orange County NC Website
15 <br /> AREA OF COMMENTS: APPLICANT BOCC RESPONSE <br /> CONCERN: RESPONSE: <br /> Includes comments <br /> made during, and staff <br /> comments identified <br /> within the abstract for, <br /> the August 27, 2012 <br /> Quarterly Public Hearing <br /> LAND USE BUFFER BOCC members asked Staff completed a site Refer to previous <br /> Continued staff to complete a field visit on September 7, response <br /> survey on.an adjoining 2012 and determined the <br /> residentially zoned property is undeveloped. <br /> property to verify if it was <br /> undeveloped at this time. <br /> STORMWATER BOCC members wanted The site plan has been BOCC — At its <br /> additional explanation from revised to denote the September 18, <br /> the applicant on the proposed stormwater 2012 regular <br /> proposed stormwater management system. meeting, the BOCC <br /> management system. indicated they were <br /> This system has been satisfied with the <br /> BOCC and Planning Board deemed adequate by modifications. <br /> members requested County Erosion Control <br /> additional detail on the site staff. Please refer to <br /> plan denoting drainage Attachment 3 for an <br /> points on the property. e-mail from Terry <br /> Hackett of Orange <br /> This request was made County Erosion <br /> after the project engineer Control tentatively <br /> indicated the property approving the <br /> would actually drain from revised stormwater <br /> multiple locations due to management <br /> existing and proposed system. <br /> topography. <br />