Orange County NC Website
~ <br /> SECTION 2.2 AND 2.7.3 CONTINUED ("Yes" indicates compliance; "No" indicates <br /> non-com oliance) <br /> PLANNING <br /> BOARD EVIDENCE SUBMITTED <br /> Ordinance RECOMMENDED TO SUPPORT BOCC <br /> Requirements FINDINGS FINDINGS FINDINGS <br /> 26 copies of an August 27, 2012 <br /> Environmental Quarterly Public Hearing <br /> Assessment or packet contains a: <br /> Environmental Impact <br /> Statement as required by 1. Detailed soils <br /> Section 6.16 of the UDO assessment and <br /> wetland delineation, <br /> completed by Soils <br /> Services PLLC, <br /> 2. A Surface Water <br /> Identification (SWID) <br /> form completed by <br /> Orange County <br /> Erosion Control, <br /> 3. The site plan <br /> contains a site <br /> analysis map <br /> Staff testified during the <br /> hearing they had <br /> determined that a formal <br /> Environmental Impact <br /> Statement is not required <br /> for the project and has <br /> issued a Finding of No <br /> Significant Impact <br /> (FONSI)for the project. <br /> 2.7.3 (13) (9) X Yes No The site plan contains a —Yes No <br /> Method of disposal of note indicating that any <br /> trees, limbs, stumps and construction or land <br /> construction debris clearing debris <br /> associated with the generated on-site will be <br /> permitted activity, which disposed of in <br /> shall be by some method accordance with the <br /> other than open burning. County's Solid Waste <br /> Management Ordinance. <br /> 2.7.3 (B) (10) X Yes No Attachment 1 of the —Yes No <br /> Statement from the August 27, 2012 <br /> applicant indicating the Quarterly Public Hearing <br /> anticipated development packet contains a <br /> schedule for the build-out narrative indicating <br /> of the project. construction would <br /> commence in 2014. <br /> Housing would take 2 to <br /> 3 years to complete <br />