Orange County NC Website
7 <br /> • A local citizen said lots 23 through 26 should be eliminated and turned into open space. <br /> • A BOCC member asked about flexible development projects within the Rural Buffer <br /> zoning district. <br /> Staff Comment: The flexible development subdivision option involves the preservation of <br /> a minimum 33% of the total tract's land area as protected open space. Development of <br /> individual lots is allowed consistent with 3 `flexible development' subdivision <br /> classifications, namely: <br /> • Estate Lot Option: Characterized with lots having a minimum area of 4 acres <br /> where the building envelope does not exceed 50% of the total lot area, <br /> • Conservation Cluster Option: Characterized by lots clustered together with a <br /> potential minimum lot area of 40,000 square feet. Allowable density is based on <br /> compliance with provisions of the UDO, <br /> • Village Option: Allows for mixed use development including various residential <br /> options (i.e. single-family, multi-family, townhome, etc.) as well as public/civic areas <br /> and non-residential development. This option is expressly prohibited within the RB <br /> zoning district as detailed within Section 7.13.2 (C)of the UDO. <br /> The clustering of lots down to 40,000 square feet in the RB zoning district is not permitted <br /> based on language contained within the UDO and the Joint Planning Land Use Plan <br /> requiring lots '2 acres in size or greater (i.e. Section 6 — Future Use — Joint Planning <br /> Area). <br /> While it is true the applicant could cluster lots, with a minimum 2 acre lot size, and provide <br /> the required 33% open space typically associated with the flexible development process, <br /> there is no incentive for the developer to do so. As a result they chose to abide by the <br /> conventional subdivision design standards and present the project as is. <br /> • A BOCC member expressed support over a potential re-assessment of the Joint Land Use <br /> Plan seeking to revise language clarifying the ability to have flexible development subdivisions <br /> on property located within the Rural Buffer-Rural Residential Joint Plan land use category. <br /> Another BOCC member indicated she felt the aforementioned re-assessment was not in <br /> order. <br /> • A BOCC member expressed frustration over requiring subdivisions to go through a land <br /> use development process and suggested the UDO be revised to not require a Class A <br /> Special Use Permit for subdivisions proposing more than 20 lots. <br /> • A BOCC member asked staff to separate explanation, discussion, or review of land use <br /> buffers and open space areas in future memorandum on this and all other similar <br /> projects. <br /> Analysis: As required under Section 2.7.4 of the UDO, the Planning Director is required to: <br /> `cause an analysis to be made of the application' and pass that analysis on to the reviewing <br /> body. In analyzing this request, the Planning Director offers the following: <br /> 1. The application has been deemed complete in accordance with the requirements of <br /> Section 2.7 and Section 5.15.6 of the UDO. <br /> 2. Staff has determined that the property is of sufficient size to support the proposed <br /> subdivision. <br />