Orange County NC Website
121 <br /> SECTION 5.16.6 CONTINUED ("Yes" indicates co iofiance• "No" indicates non-com oHance) <br /> PLANNING <br /> BOARD EVIDENCE SUBMITTED <br /> Ordinance RECOMMENDED TO SUPPORT BOCC <br /> Reguirements FINDINGS FINDINGS FINDINGS <br /> Section 5.15.6 (A) (3) <br /> Standards of Evaluation <br /> continued <br /> F Grading and Erosion <br /> Control <br /> I. Plans for grading and X No Initial review of grading —Yes No <br /> erosion control comply Yes plans by Orange County <br /> with standards Erosion Control indicates <br /> contained in the there will be no issues. <br /> Orange County <br /> Erosion and Sediment A condition of approval is <br /> Control Manual and that the formal grading <br /> this Ordinance; and erosion control plan <br /> shall be reviewed and <br /> approved prior to earth <br /> disturbing activity. <br /> ii.Construction is X No Staff has determined that —Yes No <br /> phased to the extent Yes the project will comply. <br /> practical to minimize <br /> disturbance and <br /> sedimentation; <br /> iii. Sediment control X No Detention basins to —Yes No <br /> measures will be Yes handle silt and turbidity <br /> properly installed to will be installed prior to <br /> filter sediment from any grading. Conversion <br /> runoff during of the devices will occur <br /> construction and as stabilization occurs in <br /> maintained until the sub basins. <br /> grading is complete <br /> and a permanent A condition of approval is <br /> vegetative cover has that the formal grading <br /> been established and and erosion control plan <br /> all slopes stabilized; shall be reviewed and <br /> and approved prior to earth <br /> disturbing activity. <br /> iv. Permanent X No A condition of approval is —Yes No <br /> landscaping, Yes that the formal grading <br /> groundcover, mulch, and erosion control plan <br /> etc. will be installed as shall be reviewed and <br /> soon as practical after approved prior to earth <br /> construction activities disturbing activity. <br /> for each phase are <br /> completed. <br /> SECTION 6.16.6 CONTINUED("Yes" indicates compliance: "No" indicates non-compliance) <br />