Browse
Search
Agenda - 11-20-2012 - 5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-20-2012 - Regular Mtg.
>
Agenda - 11-20-2012 - 5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 4:00:33 PM
Creation date
11/16/2012 4:00:32 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5h
Document Relationships
Minutes 11-20-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-053 Approval of Budget Amendment #4b for Upgrade Audio Visual Equipment at SHSC
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 / <br /> Sound Advice of Eastern NC Inc PROPOSAL <br /> 657-B Worthington Road <br /> PO Box 270 DATE QUOTATION... <br /> Winterville,NC 28590 <br /> 252 355-1111 9!28/2012 4600 <br /> NAME/ADDRESS <br /> Orange County <br /> PO Box 8181 <br /> 131 W.Margaret Lane <br /> Hillsborough,NC 27278 <br /> TERMS REP PROJECT <br /> Due on receipt DER 4600 Projector u:.. <br /> QTY ITEM DESCRIPTION COST Total <br /> 1 CEN-SW-POE-5 5 Port PoE Switch 260.00 260.00T <br /> 4 CBL-HD-3 HDMI 3'Certified 1080p 16bit 30.00 120.00T <br /> 1 CBL-HD-6 HDMI 6'Certified 1080p 16bit 37.50 37.50T <br /> 1 SX-AX15 I RU,8 Outlet, 15A w11P Control 1,207.70 1,207.70T <br /> 1 ERK-2725 27 Space Economy rack 25" deep with rear door 502.31 502.31 T <br /> 1 DM-CBL-8G-P-SP... DM 8G Cable Plenum(500') 420.00 420.00T <br /> 0.1 DM-8G-CONN-100 DM 8G Cable Connector(100) 375.00 37.50T <br /> 1 W&C Wire and connectors 350.00 350.00T <br /> 1 SHIPJ AND Shipping charges 311.65 311.65T <br /> 1 LABOR Labor to install projection,displays and control. 3,895.83 3,895.83 <br /> Program control <br /> ***NOTE-While this sytem fully supports <br /> HDCP content protection,this feature will be <br /> disabled so signal can pass to the video switcher <br /> for recording.When the video system gets <br /> upgraded,we can turn this feature back on <br /> which will allow full blu-ray and content <br /> protection sources to be available everywhere. <br /> Sent 9-28-12 DBE <br /> Thank you for the opportunity to quote Sales Tax (7.0%) $2,771.53 <br /> The information herein constitutes a design.Any unauthorized use or dissemination of the <br /> contents is prohibited. Total $46,260.62 <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.