Browse
Search
Agenda - 11-20-2012 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-20-2012 - Regular Mtg.
>
Agenda - 11-20-2012 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2012 3:40:24 PM
Creation date
11/16/2012 3:40:16 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 11-20-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> 1 Commissioner Jacobs said that the Board is supportive of this project and they <br /> 2 recognize that Mr. Chandler has limited resources, but since this is an entranceway to Orange <br /> 3 County, there should be standards in rural areas as in other areas. He asked staff to provide <br /> 4 some pictures of other storage units in Orange County that have buffers or clustered buffers so <br /> 5 that they can see what it will look like before making a decision. <br /> 6 Commissioner Gordon supported this. <br /> 7 There was continued discussion about the buffers. <br /> 8 <br /> 9 A motion was made by Commissioner Hemminger, seconded by Commissioner Yuhasz <br /> 10 to refer the matter to the Planning Board with a request that a recommendation be returned <br /> 11 to the Board of Commissioners in time for the November 20, 2012 BOCC regular <br /> 12 meeting, with specific additional attention on the water issue as well as other issues discussed; <br /> 13 and adjourn the public hearing until November 20, 2012 in order to receive the Planning <br /> 14 Board's recommendation and any submitted written comments. <br /> 15 <br /> 16 VOTE: UNANIMOUS <br /> 17 <br /> 18 7. Regular Agenda <br /> 19 a. Siting Criteria for Southern Branch Library—Final Recommendation <br /> 20 The Board considered approving the siting and locational criteria governing the review <br /> 21 and site selection process for the southern branch of the Orange County library. <br /> 22 Library Services Director Lucinda Munger said that this is the updated criteria for the <br /> 23 Southern Branch Library and staff has included modifications based on feedback from the work <br /> 24 session and from the Carrboro Board of Aldermen in March. The staff has incorporated <br /> 25 modifications to the criteria. The first modification is combining the previous Phases 1 and 2 <br /> 26 into the 1St phase entitled Preliminary Phase, Technical Review, and Assessment. The physical <br /> 27 attributes of a site, including environmental factors, various modules of public transportation <br /> 28 and access, alignment with planning tools, location, costs, and availability will be taken into <br /> 29 account. This phase will be done by internal Orange County staff and is estimated to take <br /> 30 anywhere from four to eight weeks, depending on the number of properties under review. Many <br /> 31 items can be done simultaneously. <br /> 32 Phase 3 in a previous version is now the 2nd phase entitled Primary Phase, Public Input, <br /> 33 and Assessment. The Board will put before the community a top site choice or choices after <br /> 34 the completion of the technical review and analysis. This portion would involve significant input <br /> 35 from residents of the surrounding communities. Estimated time for this phase would be <br /> 36 anywhere from three to five months. <br /> 37 On August 30th, staff along with Assistant County Manager Michael Talbert, met with <br /> 38 Carrboro Manager David Andrews and some of his staff to review the criteria and answer any <br /> 39 questions. Mr. Talbert also indicated that this would be brought back at the September <br /> 40 meeting. As noted in the agenda, the Town of Carrboro has already begun its own internal <br /> 41 process of evaluating sites based on compliance with local development regulations and other <br /> 42 processes. <br /> 43 The change from the original title—Southern Branch from Southwestern Branch was <br /> 44 done after a request from the Board at the June work session expressing the desire to see a <br /> 45 clear visual representation as to what constituted Southwest. The map was prepared by Mr. <br /> 46 Harvey in Planning. The primary reason for the change from the longstanding title of <br /> 47 Southwest is that they wanted to more accurately reflect the area that this library will serve, <br /> 48 making sure that it will be seen as an inclusive place to serve the needs of all the surrounding <br /> 49 community. <br /> 50 Michael Harvey explained why the name was changed from Southwestern to Southern. <br />
The URL can be used to link to this page
Your browser does not support the video tag.