Browse
Search
Minutes - 20070521
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2000's
>
2007
>
Minutes - 20070521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 1:29:08 PM
Creation date
8/13/2008 2:51:04 PM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Document Type
Minutes
Document Relationships
Agenda - 05-21-2007-c1
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-c2
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-c3
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-c4
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-c5
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-c6
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
Agenda - 05-21-2007-d1
(Linked From)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 05-21-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change requirement to protect exposed slopes with 21 calendar days instead of 3Q <br />working days <br />C. Ground Cover <br />Change requirement to provide ground cover within 90 calendar days instead of 12- <br />calendardays <br />F. Approved Plan <br />Add Item F stating that the land-disturbing activity shall be conducted in accordance <br />with the approved plan <br />Section 9 <br />Stormwater Outlet Protection <br />4. Intent <br />Add Item 4 requiring stream banks and channels downstream of the land disturbance to <br />be protected from increased velocity of runoff from the site <br />Sectian 18 <br />Sediment and Erosion Control Plans <br />Components of a Complete Plan: <br />Add a requirement that if the approved plan is not working to prevent sediment loss, the <br />plan must be revised to correct the deficiencies <br />Sectian 18 <br />Sediment and Erosion Control Plans <br />F. Financial Responsibility and Ownership <br />Clarify and add language to this existing item requiring an authorized statement of <br />financial responsibility and ownership submitted with erosion control plans <br />J. Notice of Activity Initiation <br />Add Item J requiring notification to OCEC prior to initiating land-disturbing activity <br />K. Preconstruction Conference <br />Add Item K providing for a preconstruction conference prior to land-disturbing <br />activity <br />*OCEC already requires these <br />Sectian 21 <br />Inspections and Investigations <br />Section H. Inspections and Investigations <br />Add language to require self-inspections by the developer, landowner, or financially <br />responsible party* <br />*This is in addition to the inspections conducted by OCEC staff <br />Section 22 <br />Penalties <br />4. Civil Penalty Assessment Factors <br />Add Item 4 allowing the amount of a civil penalty based on the following: <br />1. Degree and extent of harm caused <br />2. Cost of rectifying damage <br />3. Amount of money violator saved by noncompliance <br />4. Whether the violation was committed willfully <br />~. Prior record of the violator with this ordinance <br />Section 22 <br />Penalties <br />5. Notice of Civil Penalty Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.