Browse
Search
Agenda - 11-19-2012 - C1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-19-2012 - Quarterly Public Hearing - Late
>
Agenda - 11-19-2012 - C1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 4:57:39 PM
Creation date
11/12/2012 9:58:02 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2012
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes 11-19-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development will still be required to meet the impervious surface limitations <br />p q p <br />contained in Section 4.2 of the UDO. Because the impervious surface limitations <br />stem from State statutes /rules, modifications to the allowable percentages are not <br />permitted except as allowed in Section 4.2.8. <br />3. Comprehensive Plan Linkage (i.e. Principles, Goals and Objectives) <br />Oboective LU -1.1. <br />I <br />Coordinate the location of higher intensity / high density residential and non - <br />residential development with existing or planned locations of public transportation, <br />commercial and community services, and adequate supporting infrastructure (i.e., <br />water and sewer, high -speed internet access, streets, and sidewalks), while avoiding <br />areas with protected natural and cultural resources. This could be achieved by <br />increasing allowable densities and creating new mixed -use zoning districts where <br />adequate public services are available. (See also Economic Development <br />Objectives ED -2.1, ED -2.3, ED -2.10, and Water and Wastewater Objective WW -2.) <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Objective LU -3.7: <br />Ensure that new development patterns in non - residential nodes encourage a <br />clustered, walkable development pattern and discourage strip development. <br />....... <br />Objective LU -3.8: <br />Develop a process for implementing small area plan recommendations through the <br />revision of County policies and regulations. <br />....... <br />Objective LU -3.9: <br />Create new zoning district(s) which allow for a mixing of commercial and residential <br />uses, a mixing of housing types, and creates a more pedestrian friendly development <br />pattern. New districts should be applied in areas where public services exist or are <br />planned for in the future, in areas that promote higher intensity and high density uses <br />on the Future Land Use map. <br />....... <br />Objective H -3.6: <br />Work within the Orange County government system to identify and resolve existing <br />policies which may be at odds with historic preservation goals, green building <br />approaches, and workforce and affordable housing efforts. (See also Cultural <br />Resources Objective CR -3 and Economic Development Objective ED -4.1.) <br />4. New Statutes and Rules <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. <br />Not applicable. <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />C. PROCESS <br />1. TIMEFRAME /MILESTONES /DEADLINES <br />a. BOCC Authorization to Proceed <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.