Browse
Search
Agenda - 11-08-2012 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-08-2012 - Regular Mtg.
>
Agenda - 11-08-2012 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 12:23:55 PM
Creation date
11/8/2012 12:44:55 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 11-08-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-048 Bid Award - Buckhorn Mebane Phase 2 and Approval of Budget Amendment #3-C
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 5 <br /> Hoobs Upchurch Associates <br /> engineering / r/"""/"e / stir"ev`"p <br /> October 26, 2012 <br /> Mr. Craig N. Benedict <br /> Orange County Planning& Inspections Director <br /> 131 W. Margaret Lane, Suite 201 <br /> Hillsborough, NCI7278 <br /> RE: Buckhorn-Mebane EDD Phase 2 <br /> Water and Sewer System Improvements <br /> Orange County, North Carolina <br /> HUANo.: O[l0O1 <br /> SUBJECT: Recommendation of Award <br /> Craig, <br /> Construction bids were received for the above referenced work on Tuesday October 9th, at 2:00 PM. <br /> Bids were received and publicly opened and read in Conference Room 004 of the Orange County <br /> Planning and Inspections Department, Hillsborough, NC. <br /> Ten responsive bids were submitted, opened and read. Submitted bids included prices for a base bid <br /> plus pricing for five alternates. Prices for the base bid ranged from a low bid of$4,346,140.33 to a high <br /> bid of $5,964,587.00. The low, responsive bid was $4,346,140.33, submitted by J.F. Wilkerson <br /> Contracting. A certified summary of the base bids plus alternates is attached to this letter. <br /> The base bid is divided into 4 specific sections of work, referred to as Sections 1 through 4. J.F. <br /> Wilkerson's base bid price of$4,346,140.33 is for these four sections. Value engineering of the project <br /> was performed which resulted in identification of materials savings and a reduction in scope of one of <br /> the sections. These savings total approximately $339,594.59 and reduces ].F. Wilkerson's base bid to <br /> $4,016,545.74. <br /> Based upon a review of contractor qualifications in accordance with the contract documents, Hobbs, <br /> Upchurch & Associates, PA recommends that Orange County make award to ].F. Wilkerson Contracting <br /> in the amount of $4,016,545.74 for construction of the Buckhorn-Mebane EDD Phase 2 Water and <br /> Sewer System Improvements. <br /> Hobbs, Upchurch & Associates, PA appreciates the opportunity to be of continued service to Orange <br /> County and looks forward to working with the County during the construction phase of this project. <br /> Should you have any questions or need additional information regarding the bids or the project in <br /> general, please do not hesitate to contact us at (910) 692-5616. <br /> Sincerely, <br /> HOBBS, UPCHURCH &ASSOCIATES, P.A. <br /> Robert Bernard, P.E. <br /> Enclosures <br /> T:910.692.5616 | F:910.692.7342 I 300 SW BROAD STREET I SOUTHERN PINES,NC 28387 | wWw,HnaasupuxunCH.now <br /> 'SUPERIOR PERFORMANCE THROUGH wwovAnveDESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.