11 <br /> EJCDC <br /> SUGGESTED FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR FOR <br /> CONSTRUCTION CONTRACT(STIPULATED PRICE) <br /> THIS AGREEMENT is by and between Orange County <br /> (Owner)and <br /> (Contractor). <br /> Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br /> described as follows: <br /> Orange County Buckhorn-Mebane EDD Phase 2 Water and Sewer Improvements <br /> ARTICLE 2-THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described <br /> as follows: <br /> The Work is generally described as follows: The proposed sewer improvements include the <br /> installation of approximately 923 lf of 8-inch, 5,093 lf of 12-inch, and 8,976 lf of 18-inch gravity sewer <br /> and 73 manholes. <br /> Proposed water improvements include the installation of approximately 14,020 lf of 16-inch water <br /> main. <br /> ARTICLE 3 -ENGINEER <br /> 3.01 The Project has been designed by Hobbs,Upchurch&Associates,P.A.-300 S.W. Broad Street,Southern Pines, <br /> North Carolina 28387(Engineer),who is to act as Owner's representative, assume all duties and responsibilities, and <br /> have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the <br /> Work in accordance with the Contract Documents. <br /> ARTICLE 4-CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated <br /> in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion and Final Payment <br /> A. The Work will be substantially completed within 365 consecutive calendar days after the date when the Contract <br /> Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final <br /> payment in accordance with Paragraph 14.07 of the General Conditions within 395 consecutive calendar days after the <br /> date when the Contract Times commence to run. <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00520-1 <br />