Browse
Search
Agenda - 11-08-2012 - 7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-08-2012 - Regular Mtg.
>
Agenda - 11-08-2012 - 7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 12:23:55 PM
Creation date
11/8/2012 12:44:55 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
Document Relationships
2013-069 Planning - J F Wilkerson Contracting - Buckhorn-Mebane EDDD Phase 2 Water and Sewer Improvemtnts $4,016,545.74
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2013
Minutes 11-08-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-048 Bid Award - Buckhorn Mebane Phase 2 and Approval of Budget Amendment #3-C
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> EJCDC <br /> SUGGESTED FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR FOR <br /> CONSTRUCTION CONTRACT(STIPULATED PRICE) <br /> THIS AGREEMENT is by and between Orange County <br /> (Owner)and <br /> (Contractor). <br /> Owner and Contractor, in consideration of the mutual covenants set forth herein, agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br /> described as follows: <br /> Orange County Buckhorn-Mebane EDD Phase 2 Water and Sewer Improvements <br /> ARTICLE 2-THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described <br /> as follows: <br /> The Work is generally described as follows: The proposed sewer improvements include the <br /> installation of approximately 923 lf of 8-inch, 5,093 lf of 12-inch, and 8,976 lf of 18-inch gravity sewer <br /> and 73 manholes. <br /> Proposed water improvements include the installation of approximately 14,020 lf of 16-inch water <br /> main. <br /> ARTICLE 3 -ENGINEER <br /> 3.01 The Project has been designed by Hobbs,Upchurch&Associates,P.A.-300 S.W. Broad Street,Southern Pines, <br /> North Carolina 28387(Engineer),who is to act as Owner's representative, assume all duties and responsibilities, and <br /> have the rights and authority assigned to Engineer in the Contract Documents in connection with the completion of the <br /> Work in accordance with the Contract Documents. <br /> ARTICLE 4-CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated <br /> in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion and Final Payment <br /> A. The Work will be substantially completed within 365 consecutive calendar days after the date when the Contract <br /> Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final <br /> payment in accordance with Paragraph 14.07 of the General Conditions within 395 consecutive calendar days after the <br /> date when the Contract Times commence to run. <br /> EJCDC C-520 Suggested Form of Agreement Between Owner and Contractor for Construction Contract(Stipulated Price) <br /> Copyright 8 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00520-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.