Orange County NC Website
8 <br /> ATTACHMENT 2 <br /> Northern Human Services Center Development Option Comparison <br /> Option 1 Option 2 <br /> New Construction, 10,000 square foot pre- Removal of classroom wings, adaptive <br /> engineered metal building, standing seam re-use of 10,000 square foot center <br /> roof, masonry and/or block accented portion; new roof and building systems; <br /> exterior walls; standard interior upfit standard interior upfit <br /> Abatement, Removal $220K- $250K $175K- $225K <br /> Design, Construction, Equipment $1.3M - $1.5M $1.36M - $1.58M <br /> Contingency $300K- $350K $309K- $366K <br /> Schematic Budget Estimate $1.82M -$2.10M $1.84M -$2.17M <br /> Schematic Budget per square foot $182 -$210 $185 -$217 <br /> Considerations: <br /> Development and Construction Cost Lower Low to Mid-Range <br /> Design Flexibility Higher Lower <br /> Programmed Use Flexibility Higher Lower <br /> Unforeseen Conditions Lower Higher <br /> Original Structure's Use? No Yes <br /> Estimated Future Operating Costs Low to Mid-Range Low to Mid-Range <br />