Browse
Search
Agenda - 11-08-2012 - 7a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-08-2012 - Regular Mtg.
>
Agenda - 11-08-2012 - 7a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:40:09 PM
Creation date
11/8/2012 12:34:31 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 11-08-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> foot facility that would follow a new construction path ("Option 1") or the "adaptive re-use" <br /> construction path ("Option 2"). Attachment 2, entitled "NHSC Development Option <br /> Comparison", compares and contrasts these two options. <br /> In summary, while both options are similar in total cost, Option 1 allows for more design and <br /> space planning flexibility. Option 2 maintains the important social, cultural, and historic <br /> elements within the design, but would restrict some space planning and use flexibility. <br /> The September 25, 2012 public meeting produced a strong preference for Option 2, the <br /> "adaptive re-use" path. Attachment 3 is a September 25, 2012 NHSC Community Meeting #2 <br /> Summary which provides the salient outcomes of that meeting. <br /> In addition to the preference for Option 2, the public meeting group embraced staff's suggestion <br /> that an informal resident design and review advisory group be presented to the Board for <br /> approval. <br /> This item was presented to the Board during the October 25, 2012 work session. Members of <br /> the public who had previously attended the public meetings were invited to attend this work <br /> session. These individuals have also been invited to the November 8, 2012 regular meeting <br /> and have been informed that they can comment on this item during its presentation. <br /> Should the Board approve the Manager's recommendations, the general development timeline <br /> may be as follows: <br /> TASK PROPOSED END BY <br /> BEGINNING DATE <br /> DATE <br /> BOCC Action: Decision on Mana er recommendations 11/8/12 11/8/12 <br /> NHSC fully vacated 12/31/12 12/31/12 <br /> Project design RFQ process; Board approval of Designer 3/1/13 6/20/13 <br /> Contract <br /> BOCC Action: Approval for Designer Professional Services 6/20/13 6/20/13 <br /> Agreement (est.) <br /> Pro�ect schematic desi n 6/20/13 10/20/13 <br /> BOCC Action: A roval of Schematic Desi n est. 10/20/13 10/20/13 <br /> Project final design, bid document preparation 11/1/13 1/31/14 <br /> Project Bid - abatement, deconstruction and adaptive re-use 2/1/14 4/28/14 <br /> construction (est.) <br /> BOCC Action: Bid Award, Budget Approval for Construction 6/20/14 6/20/14 <br /> (est.) <br /> Construction, Commissionin , O enin est. 8 months duration 7/1/14 3/1/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.