Browse
Search
Agenda - 11-08-2012 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2012
>
Agenda - 11-08-2012 - Regular Mtg.
>
Agenda - 11-08-2012 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:39:01 PM
Creation date
11/8/2012 12:26:18 PM
Metadata
Fields
Template:
BOCC
Date
11/8/2012
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-08-2012
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2012
ORD-2012-047 Ordinance Amending the Unified Development Ordinance regarding review and permitting of solar arrays
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> solar arrays from a landscape/buffer, setback, stormwater, impervious surface limit, <br /> or height limitation standpoint. <br /> There is also no administrative procedure within the UDO that would provide staff <br /> sufficient flexibility in addressing these issues without a comprehensive amendment <br /> package, except the potential of using the Conditional Use process that would create <br /> site specific regulations for a given property mutually agreed to by the applicant and <br /> the elected officials. <br /> This proposal establishes a hierarchy of review/approval processes allowing for the <br /> development of a solar array based on the level of anticipated service to the property <br /> owner, specifically: <br /> • An array generating under 20 kilowatts or power on a residentially zoned <br /> parcel of property shall be processed administratively by staff as an `accessory <br /> use'. With respect to a non-residential development, the established limits <br /> allowing for the request to be processed administratively shall be based on the <br /> estimated power needs of the land use; <br /> • An array generating over 20, but under 100, kilowatts is classified as a `Solar <br /> Array — Large Facility' within the UDO requiring the issuance of a Class B <br /> Special Use Permit; and <br /> • An array generating over 100 kilowatts is classified as a `Solar Array — Public <br /> Utility' within the UDO requiring the issuance of a Class A Special Use Permit. <br /> The Planning Director recommends approval of the proposed UDO amendments as <br /> contained within Attachment 2 based on the following: <br /> i. The amendments establish appropriate permitting thresholds and review <br /> criteria for solar arrays; <br /> ii. Previously identified inconsistences have been corrected; <br /> iii. The amendments are reasonably necessary to promote the public health, <br /> safety, and general welfare and to achieve the purposes of the adopted <br /> Comprehensive plan or part thereof; and, <br /> iv. The UDO amendments are consistent with the goals and policies of the <br /> adopted Comprehensive Plan. <br /> 3. Comprehensive Plan Linkaqe (i.e. Principles, Goals and Objectives) <br /> Land Use Overarchinq Goal: Coordination of the amount, location, pattern and <br /> designation of future land uses, with availability of County services and facilities <br /> sufficient to meet the needs of Orange County's population and economy consistent <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.